1985]

UNIVERSITY OF ILLINOIS

247

Alternates NA Total $ 22 974

Ventilation Base Bid R . H . Bishop Company, C h a m p a i g n . . . $ 22 974 Electrical Work Downtown Electric Incorporated, Urbana

123 112

E-2:

$761

123 873 $340 068

Acceptance of Alternate G-l provides that all contracts, other than the contract for general work, be assigned to the contractor for general work. It is further recommended that an agreement be made with C. A. Petry for the assignment of the other contracts. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve Account. T h e project will include the following remodeling in the Triad buildings: the final phase of an electronic fire-detection and alarm system, installation of an emergency electrical generator, remodeling of bathrooms, and insulation of the attic. In the Taft/Van Doren buildings, the project includes the first phase of an electronic fire-detection and alarm system, plus the installation of a new standpipe system. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contracts for Remodeling, Memorial Stadium, Urbana

(29) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts, the award in each case to the low bidder on its base bid (plus acceptance of the indicated alternate), to renovate the locker room in the northwest ramp tower at Memorial Stadium, Urbana. Division I — General English Brothers Company, Champaign Base Bid Alt. 1A (Assignment Fee) Division II — Plumbing R. H. Bishop Company, Champaign $ 79 850 2 200 $ 82 050 Base Bid 22 898

Division III — Heating and Temperature Control Nogle and Black Heating & Air Conditioning Co., Inc., Champaign Base Bid Division IV— Ventilation A & R Mechanical Contractors, Inc., U r b a n a . . . .Base Bid Division V — Electrical William Anderson d / b / a Coad Electric Co., Champaign Total

32 993 31 294

Base Bid

21 000 $190 235

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work.