248

BOARD OF TRUSTEES

[April 18

Funds are available from private gift funds held by the University for the benefit of the Athletic Association. T h e work involves the renovation of 11,050 gross square feet of the existing locker room which will be utilized by the varsity football team during the 1985 season. Thereafter, it will provide locker, training, and equipment-room space for the men's and women's track teams and visiting teams. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . F o r s y t h , t h e s e c o n t r a c t s w e r e a w a r d e d by t h e foll o w i n g v o t e : Aye, M r s . D a y , M r . F o r s y t h , M r s . G r a v e n h o r s t , M r . H a h n , M r . H o w a r d , M r . L o g a n , M r . M a d d e n , M r s . S h e p h e r d , Miss S m i t h ; n o , n o n e ; absent, Governor T h o m p s o n . ( T h e s t u d e n t a d v i s o r y v o t e w a s : Aye, M r . L a m m , M r . P i t t m a n ; n o , none.)

Contracts for Foundation Walls, Air-Supported Structure, Memorial Stadium, Urbana

(30) An air-supported structure 1 has been proposed to cover the playing surface in Memorial Stadium at the Urbana campus. The $1.5 million project would be included in the projects funded from the proceeds of a bond sale currently planned for July 1985. T h e project will require a perimeter foundation wall to provide anchoring for the structure. T h e construction of the foundation must be coordinated with the installation of the artificial turf previously authorized and scheduled to be completed by August 1, 1985. Therefore, it is necessary to award a contract for the foundation at this time. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts, the award in each case being to the low base bidder, to provide the foundation walls adjacent to the west and east main stands. General English Brothers Company, Champaign Electrical William Anderson d / b / a Coad Electric Co., Champaign Total Base Bid $292 300 39 300 $331 600

Funds are available initially from the restricted funds operating budget of the Urbana-Champaign campus physical plant, with reimbursement from the proceeds of a new bond issue, or from private gift funds held by the University for the benefit of the Athletic Association. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . F o r s y t h , t h e s e c o n t r a c t s w e r e a w a r d e d by t h e foll o w i n g v o t e : Aye, M r s . D a y , M r . F o r s y t h , M r s . G r a v e n h o r s t , M r . H a h n , M r . H o w a r d , M r . Logan, M r . M a d d e n , Mrs. Shepherd, Miss S m i t h ; no, n o n e ; absent, G o v e r n o r T h o m p s o n . ( T h e s t u d e n t a d v i s o r y v o t e w a s : Aye, M r . L a m m , M r . P i t t m a n ; n o , none.)

Contract for Foundation Wall, Addition to Memorial Stadium, Urbana

(31) A $4.2 million renovation and addition to the Memorial Stadium football i Dimenaionj: 248 feet wide by 407 feet long by 70 feet high.