UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 26]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 26 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



I950]

UNIVERSITY OF ILLINOIS

23

EXPENDITURES

SPECIAL APPROPRIATIONS FOR N O N R E C U R R I N G

(7) The Committee on Nonrecurring Appropriations recommends assignments of funds for the following purposes: Urbana-Champaign 1. Remodeling, Department of Food Technology $ 9 000 From the state appropriation for "Construction of agricultural structures and remodeling of present agricultural buildings" 2. Equipment, Department of Mining and Metallurgical Engineering 8 865 3. Equipment, Department of Art 5 O00 4. Remodeling, Departments of Geology and Entomology IS 5°° 5. Microscopes, Department of Entomology 6 600 6. Remodeling, Department of Bacteriology 22 225 7. Remodeling, Department of Civil Engineering 2 700 8. Equipment and remodeling, Electrical Engineering Research Laboratory I 100 9. Reconditioning of hockey field and equipment, Department of Physical Education for Women 3 100 10. Equipment and remodeling, School of Physical Education 34 660 Chicago Professional Colleges 11. Equipment and repair work, College of Dentistry 22 250 From the state appropriation "Equipment for buildings at Urbana-Champaign and Chicago" 12. Equipment and rehabilitation of equipment, Animal Hospital I 600 13. Remodeling, Aeromedical and Physical Environment Laboratory 1 400 Total $134 000 Except as indicated in items I and II, it is recommended that these assignments be made from the General Reserve Fund. I concur. O n motion of M r s . W a t k i n s , these appropriations were made as recommended by the following vote: Aye, Mr. Fornof, Mr. Herrick, Mr. Hickman, M r s . Holt, M r . Livingston, D r . Meyer, M r s . W a t k i n s , Mr. Williamson; no, n o n e ; absent, M r . McLaughlin, M r . Nickell, M r . Stevenson.

APPROPRIATION FOR REMODELING OF NATURAL HISTORY BUILDING

(8) The Board of Trustees has authorized the construction of a new stair well in the Natural History Building to eliminate one of the fire hazards in that building, and a contract for this has been let. Construction of a new stair well deprives the Department of Physiology of some laboratory space which is essential for graduate study. However, space elsewhere in this building can be converted into satisfactory laboratory facilities at an estimated cost of $4,000 for the remodeling and $2,500 for the equipment. I recommend that an appropriation of $6,500 be made from the General Reserve Fund for this purpose. O n motion of M r . Livingston, this appropriation was made by the following vote: Aye, M r . Fornof, M r . Herrick, Mr. Hickman, M r s . Holt, M r . Livingston, D r . Meyer, M r s . W a t k i n s , M r . Williamson; no, n o n e ; absent, Mr. McLaughlin, M r . Nickell, Mr. Stevenson; and a change in the contract with C. A . P e t r y and Sons, Champaign, for the construction of the new stair well was authorized to include remodeling required to provide laboratory facilities for the D e p a r t m e n t of Physiology.