UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 1167]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1167 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1264

BOARD OF TRUSTEES

Department Physical Plant Physical Plant Storeroom

[October 23

Cost i ,437 41 f.o.b. delivered f.o.b. cars, Champaign 9 440 00 f.o.b. delivered

Item 54 doz. 100% pure China bristle paint brushes One carload, consisting of approximately 18,000' of standard steel pipe, galvanized and black in sizes i ' t o 4* 80,000 gallons (approximate) No. 3 fuel oil

Vendor D e M e r t & D o u g h e r t y Co., Chicago Field & Shorb Co., Decatur Champaign Builders S u p p l y Co., Champaign

Institute of Aviation

On motion of Mr. Grange, these purchases were authorized.

COMPTROLLER'S REPORT OF CONTRACTS

(22) The Comptroller's report of contracts executed during the period September 1 to 30, 1951. Amount to be

With Whom Smith, Kline, and French Laboratories United States Department of State Refrigeration Research Foundation, Inc. With Whom American Abrasive Metals Company H. F. Huster Burlington Roofing Company Commonwealth Edison Company R. G. Jessup Purpose Study of drug reaction on muscular control S.C.C.—8211 Study of refrigerated warehousing of foods Purpose Construction of stairways in DentalMedical-Pharmacy Building Asphalt and rubber tile flooring in Dental-Medical-Pharmacy Building Roofing and sheet metal work at Student-Staff Apartment Building, Chicago Electric service at Student-Staff Apartment Building, Chicago Demolition of McCullough farm house Paid to the University $S 350 co 5 838 00

1 000 00

Dote July 12, 1951 May 8, 1951 September 27,

Amount to be Paid by the University

$1 807 0 0 919 00 791 00

Date August 30, 1951 August 21, 1951 August 21, 1951 September 12, 1951 August 1, 1951

Rate per contract No charge

Contract Changes

With Whom United States Army Eli Lilly and Co. Lederle Laboratories Lederle Laboratories Purpose W-49-007-MD-496 Modification fi Study of pyruvic acid Study of aureomycin in nutrition of baby pigs Study of aureomycin in nutrition of swine Amount to be Paid to the University

$1} 114 00 8 500 00 1 000 00 1 500 00

Dote June 30. 1951 August 30, 1951 August 29, 1951 August 29, 1951

Adjustments Made in Authorizations Issued Under Cost-Pius Contracts (1951-1952)

With Whom Anderson Electric Company E. N. DeAtley Clyde E. Gates Reliable Plumbing and Heating Co. Purpose Student and Staff Apartments Noyes Laboratory renovation and modernization Sub-total Changes in administrative offices Sub-total Robert Allerton Park fire protection Sub-total Noyes Laboratory remodeling, renovation, and modernization Natural History renovation and ventilation Sub-total Noyes Laboratory third and fourth floor remodeling Noyes Laboratory third and fourth floor remodeling Sub-total

Amount $2. 157 63 1 494 90 (3 652 389 (389 2 422 (2 422 3 788 53) 651 65)' 00 00) 59

Date

A u g u s t 20, 1951 A u g u s t 30, 1951 September 13, 195 A u g u s t 3 1 . 1951 A u g u s t 30, I9S 1 September »o, i95 ; A u g u s t 30. 1 9 5 ' A u g u s t 30, 1951

206 73 1 (3 58l 86) I 205 39 286 90 (1 492 10)

Schroeder's

'Deduct.