1973]

UNIVERSITY OF ILLINOIS

301

A schedule of bids received has been filed with the Secretary of the Board for record. O n motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Neal, Mrs. Rader, Mr. Swain; no, none; absent. Dr. Bakalis, Mr. Steger, Governor Walker.

CONTRACT FOR REPAIRS T O CONDENSATE LINES. MEDICAL CENTER

(22) The President of the University, with the concurrence of appropriate administrative officers, recommends award of a contract in the amount of $24,200 to Delta Piping Co., South Holland, Illinois, the low bidder, for work to repair the underground condensate lines of the steam distribution system on Polk Street near Marshfield Avenue at the Medical Center campus. Funds for this work are available from the Steam Plant Revolving Account.

On motion of Mr. Forsyth, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr, Hahn, Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Neal, Mrs. Rader, Mr. Swain; no, none; absent, Dr. Bakalis, Mr. Steger, Governor Walker.

CONTRACTS FOR CONTRACTORS' FEES FOR MINOR REMODELING AND NEW CONSTRUCTION, URBANA

(23) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts for minor remodeling and new construction at the Urbana campus for the period July 1, 1973, through June 30, 1974, with an option by the University to extend this contract for the additional period of one year upon the same terms and conditions, the award in each case being to the lowest bidder: Total Per Cent Per Cent Per Cent Estimated for for for SubFee Materials Labor contracts Payments General Glenwood and Jim H. Gladney, a partnership doing business as Gladney Brothers Construction Company, Champaign 5 30 3 $14 400 Heating, Piping, and Refrigeration David W. Reichard Plumbing and Heating Co., Inc., an Illinois Corporation, Urbana 10 46 5 IS 82S Insulation Sprinkmann Sons Corporation of Illinois, an Illinois Corporation, Peoria 14 62.5 7 10 075 Plastering, Plaster Patching, and Repairs E. T. Drewitch, an Individual doing business as E. T. Drewitch Lathing and Plastering Contractor, Urbana 5 13 -02 000 These contracts will be for work on projects estimated to cost less than $25,000. The several contractors bid on percentages to be added to an estimated volume of material, labor, and subcontracts, and the awards recommended are to the low bidders. A schedule of the bids received has been filed with the Secretary of the Board for record. The work will be done as ordered by the Operation and Maintenance Division and will be paid for on the basis of the actual cost of each job plus contractors' fees. Funds as required for each job will be covered by a job order charged against funds allocated for each such project.^ It is further recommended that the Vice President for financial Affairs