BOARD OF TRUSTEES

[June 20

Heating, Air Conditioning, and Process Piping S. J. Reynolds Co., Inc., Cicero Base Bid.. 16 758 Additive Alternate M-2 8 405 Total , 25 163 Ventilation and Air Conditioning Reliable Sheet Metal Works, Inc., Elk Grove Village. .Base Bid 8 698 Plumbing Ewing Plumbing, Inc., River Forest Base Bid 875 Total $86 647 It is further recommended that all contracts other than the contract for General Work be assigned to the Contractor for General Work, making the total of this contract $86,647, and that an agreement be entered into with Mueller Construction Co. for the assignment of the other contracts. The fee for this assignment is included in the base bid for the General Work. Funds for this work are available in the University Hospital Income Account. A schedule of the bids received has been filed with the Secretary of the Board for record.

On motion of Mr. Livingston, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Neal, Mrs. Rader, Mr. Swain; no, none; absent, Dr. Bakalis, Mr. Steger, Governor Walker.

CONTRACTS FOR CONTRACTORS' FEES FOR REMODELING IN ILLINOIS SURGICAL INSTITUTE. MEDICAL CENTER

(21) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts based on percentages bid for contractors' fees for the second phase of remodeling patient care areas of the Orthopedics Department on the first floor of the Illinois Surgical Institute Building at the Medical Center campus, the award in each case being to the low bidder: Per Per Per Cent Cent Cvnt Estimated Total for for for SubFee Estimated Materials Labor contract Payments Payments General Tal Rauhoff, Inc., Chicago S 29 5 $1 004 00 $14 004 00 Plumbing G.F.ConnellyCo.,Inc.,Chicago.. 9.5 29 8 2 575 00 13 975 00 Piping, Refrigeration and Automatic Temperature Control The Nu-Way Contracting Corp., Chicago 8 32 2 2 322 00 13(22 00 Ventilation Narowetz Heating and Ventilating Company, Melrose Park 15 40 -0747 50 2 897 50 Electrical G&M Electrical Contractors Co., Chicago 7 30 -01717 00 11 217 00 Total $56 205 50 In the ventilating bid, Narowetz Heating and Ventilating Company and Reliable Sheet Metal Work, Inc., tied for the lowbid. In accordance with the University's regulations adopted pursuant to the Illinois Purchasing Act, the tie was broken by lot since the bids and bidders were deemed equal in every respect, and Narowetz Heating and Ventilating Company is recommended for the award. Funds for this work are available in the University Hospital Income Account.