1973]

UNIVERSITY OF ILLINOIS

299

room buildings would be performed by the Company at a fee based upon the actual cost of labor and materials plus a reasonable overhead factor. 8. The increased cost of discrete channel converters, installation, and maintenance over that of regular converters or the full cost where regular converters are not installed would be paid by the University and tlie University would assume responsibility for loss of or malicious damage to converters, 9. The contract will require the University to carry liability insurance covering its use of the system and will provide for the granting of easements over University property as needed for the University and city systems, 10. The Company will provide an annual scholarship for a student enrolled in the Department of Radio and Television. 11. All commitments by the University would be subject to the availability of funds. Funds will be provided from the operating budgets of the University units utilizing the service. I concur. During discussion of this hem, Mr. Livingston joined the meeting. O n motion of Mr, Howard, this recommendation was approved by the following' voter Aye, Mr. Forsyth, Mr. H a h n , Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Meal, Mrs. Rader, Mr. Swain; no. n o n e ; absent, Dr. Bakalis, Mr. Steger, Governor Walker.

CONTRACT FOR RENTAL OF EQUIPMENT WITH OPERATORS FOR SNOW REMOVAL, LANDSCAPING AND SITE DEVELOPMENT WORK AND MATERIALS, CHICAGO CIRCLE AND MEDICAL CENTER

(19) The President of the University, with the concurrence of appropriate administrative officers, recommends, subject to the availahility of funds, award of a contract to Ryan Bros., Inc., Chicago, the only bidder, for furnishing equipment with operators for snow removal, landscaping and site development work, and materials during Fiscal Year 1974 for the Chicago Circle and Medical Center campuses in the estimated amount of $50,350. Under this contract, the contractor will be compensated for furnishing each item of equipment with operator at the rate specified and material will be supplied at the unit rate specified in the proposal. Funds have been requested in the operating budget of the Physical Plant Department for the Chicago campuses for FY 1974 and are also available in the Chicago Circle and Medical Center Parking accounts. O n motion of Mr, Swain, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr. H a h n , Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Meal, Mrs. Rader, Mr. S w a i n ; no, none; absent, Dr. Oakalis, Mr. Steger, Governor Walker.

CONTRACTS FOR REMODELING IN HOSPITAL ADDITION BUILDING. MEDICAL CENTER

(20) The President of the University, with the concurrence of appropriate administrative officers, recommends (he award of the following contracts for remodeling Operating Room No. 3 on the fourth floor of the Hospital Addition Building at the Medical Center campus, the award in each case being to the low bidder on both base contract work and additive alternates: General Mueller Construction Co., Chicago Base Bid $22 176 Testing and Balance Precis ion aire, Inc., Wheatan Base Bid 28S Electrical Fries Walters Co., Chicago Base Bid..$26 66S Additive Alternate E-l 2 610 Additive Alternate E-2 175 Total 29 450