TQ40]

UNIVERSITY OF ILLINOIS

751

Change O r d e r No. 5, contract with Phillips, Getschow Company for Heating, Ventilating, and Air Conditioning W o r k . (1) Provide radiator complete with thermostatic control for Room 103 $ 123 51 (2) Change installation of high pressure steam lines in ground story adjacent to Column 23, in accordance with drawing prepared by Samuel R. Lewis, dated August 9, 1939 47 67 (3) Provide scaffolding for which there are no provisions (indicated in specifications to be furnished by others) 65 30 (4) Provide additional structural steel pipe and flanges in ducts of ballroom ceiling to provide adequate supports for main ballroom fixture.. 113 85 Total Additional Cost $ Change O r d e r No. 6, contract with Phillips, Getschow Company for Heating, Ventilating, and Air Conditioning Work. (1) Change high pressure steam installation as covered by estimate dated January 18, 1940, and drawing No. HV-14R $ 307 91 (2) Relocate unit heating installation at south ground story entrance as indicated on drawing No. H V - i A 139 15 Total Additional Cost $ First Addition to McKinley Hospital Change O r d e r No. 11, contract with Wm, C. F. Kuhne for General W o r k . (1) Provide screens with wood frames instead of metal—Deduct $ 71 85 (2) Paint all bull nose corner beads two coats of flat paint not otherwise painted. Paint the four dumbwaiter doors three coats of enamel, the last coat rubbed—Add 71 30 Total Deduction $ Gregory Hall

350 33

447 06

55

Change Order No. 16, contract with the W. E. O'Neil Construction Company for General W o r k . (1) Omit asphalt tile and interior painting, other than wood finishing, as covered by drawing No. R-30—Deduct $1 529 83 (2) Reinstate asphalt tile floor for east basement corridors 30C and 30D including provision of non-slip nosings on stair treads, and brass edging at door openings—Add 257 91 Net Deduction $1 271 92

On motion of Mrs. Plumb, the action of the President of the University in authorizing these change orders was approved and confirmed.

EXTENSION OF TIME ON P.W.A. PROJECTS (15) A recommendation that an extension of time on projects Illinois 1062-F and 1745-F be requested.

On motion of Mr. Moschel, the following resolutions (I, II, III) were severally adopted.