1939]

UNIVERSITY OF ILLINOIS

197

Relocation and replacement of present 2" water service to Entomology Building, also to permit relocation of electrical conduit, using extra heavy galvanized steel pipe, as per quotation Provide five 14" extensions for water valve boxes in accordance with letter of November 29, 1938 Relocation of branch service lines to new Union Building and relocation of fire hydrant north of the building, at no change in price Change Order No. 1, contract with the Carson-Payson Company for diversion of steam piping. Increase in size of 29 cast iron rollers under steam main as it was considered the size indicated was inadequate Change Order No. 2, contract with E. N. DeAtley for steam tunnel construction. Tests on concrete cylinders as required under Article No. 1.21 of the Addenda to the Specifications by the Owner Change O r d e r No. 2, contract with General Paving Company for relocation of sanitary sewers. Relocate and relay about 22 ft. of 4" sanitary sewer just north of Entomology Building, connecting same to new manhole Change discharge outlet from tunnel pump so as to run through old tunnel instead of new and to discharge into new manhole E-2, deduct Addition to Library (111. No. 1962-F) Change Order No. 1, contract with English Brothers for general construction. T o cover additional excavating and concrete work under the basement floor slab and in connection with building footings not called for by the drawings Change Order No. 1, contract with the Carson-Payson Company for plumbing and heating. T o cover incidental costs on sump pump due to relocation of pit to receive same and locating pump above basement floor Change Order No. 2, contract with English Brothers for general construction. Relocate and construct pit for sump pump in accordance with new design detailed on drawing "showing changes in connection with relocation of sump pump," also small sump in elevator pit to receive hydraulic buffer Provide all new cubicle doors (100) with locks #6725, without turn knobs, on a master key independent of building m a s t e r . . .

$122 43 $ 13 60

$ 58 36

$ 55 00

$ 40 00 $ 10 00

$414 47

$ 15 00

$ 90 80 $ 88 00

Addition to McKinley Hospital Change O r d e r No. I, contract with the Westinghouse Electric Elevator Company for the elevator work. Furnish elevator sills of alumalun and aluminum kickplates on the hatch doors instead of brass as provided in the specifications, deduct $ 52 00

On motion of Mr. Cleary, the action of the President of the University in authorizing these change orders was approved and confirmed.

ILLINI U N I O N BUILDING SERVICE CHARGE (15) T h e Board of Trustees has already approved as a matter of policy the charging of a fee to finance the construction of a student center building. The financing of the construction of the Illini Union Building contemplates the