UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1982 [PAGE 346]

Caption: Board of Trustees Minutes - 1982
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 346 of 658] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1981]

UNIVERSITY OF ILLINOIS

335

Chicago Circle

FY 1982 Project Project Budget SR' (CD Bonds) Exterior and Interior Masonry $ 253 200 Repairs, Phase III, Education and Communications Building Electrical Upgrade-12KV Under46 900 -. ground System, Lecture Center and Services Building Lighting Modifications, Art and 113 200 Architecture Building and Lecture Center Stairway and Upper Walkway 368 700 Repairs (Phase II) Energy Conservation (GRF) Heat Reclaim System Modify Control Systems Zone Radiation Modify Domestic Hot Water System 822 70 61 38 Professional Firm Recommended Carl Klimek & Associates, Chicago

Wolfson, Leavitt & Associates, Chicago John Victor Frega Associates, Chicago

500") 700 I Power Design Services, Inc., 900 f Chicago 100 J

Medical Center SR' (CD Bonds) $ 117 000 Construct Utility Shafts, Hospital Addition Install Laboratory Utility Risers, 166 000 Hospital Addition Install Domestic Water and Waste 250 000 Risers, Hospital Addition Install Acid Waste Risers, Hospital 42 000 Addition Revise and Install Ventilation 716 000 System, Hospital Addition Energy Conservation (GRF) Upgrade Fan Systems Upgrade Heating Controls Building Equipment Automation, Peoria School of Medicine

Graham, Anderson, Probst & White, Chicago

333 000 81 000 108 000

Environmental Systems Design, Inc., Chicago Associated Engineers, Inc., Peoria

Urbana-Champaign

Building & Utilities (CDBonds) Library Sixth Stack Addition Remodeling (CDBonds) Willard Airport Fuel Conversion Energy Conservation (GRF) Animal Room Improvements Ventilation Turndown $9 718 500 Lankton-Ziegele-Terry and Associates, Inc., Peoria Sandhu and Associates, Champaign

266 000

291 000 1 R. J. Henneman & Associates, 13 500 ) Champaign

Funds for employment of the professional firms have been appropriated to the Capital Development Board for FY 1982.