|
| |
Caption: Board of Trustees Minutes - 1982 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1981] UNIVERSITY OF ILLINOIS 265 O n m o t i o n of D r . D o n o g h u e , these c o n t r a c t s w e r e a w a r d e d a n d a u t h o r i t y w a s given as r e c o m m e n d e d by t h e following v o t e : Aye, M r s . Day, Dr. D o n o g h u e , M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . M a d d e n , Mrs. Shepherd, M r . Stone; no, n o n e ; absent, M r . Neal, Governor T h o m p son. ( T h e s t u d e n t advisory v o t e w a s : Aye, M r . M a l t e s e , M r . P e t e r s o n , M r . Silverman; no, none.) Contracts for Contractors' Fees for Repairs, Minor Remodeling, and New Construction, Fiscal Year 1982, Urbana (27) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following cost-plus contracts for repairs, minor remodeling, and new construction at the Urbana-Champaign campus for the period July 1, 1981, through June 30, 1982. T h e contractors bid on percentages to be added to an estimated volume of material, labor, and subcontracts, and the awards recommended are to the low bidders. T h e contracts are for individual projects estimated to cost less than $25,000. The University would have the option to extend these contracts for an additional year upon the same terms and conditions, subject to approval by the Board of Trustees. Percent for Material 1.49 Percent for Percent for Labor Subcontracts 39.44 1.49 Total Estimated Fee Payments $42 867 General Central Illinois Tribal Council, Inc., d / b / a A. J. Contracting, Tuscola.. . Electrical Bruce G. Schweighart, d / b / a Central Illinois Electric Co., Pesotum 22 Plumbing Reliable Plumbing Champaign & Heating Co., 8 34 5 19 700 49 5 20 600 Heating, Piping, and Refrigeration Reliable Plumbing & Heating Co., Champaign 8 49 5 50 050 Ventilation and Distribution System for Conditioned Air R. H. Bishop Company, C h a m p a i g n . . . 8 Plastering, Plaster Patching, and Repairs E. T. Drewitch, d / b / a E. T. Drewitch Lathing and Plastering Contractor, Urbana 5 Insulation Champaign A & K Insulation Champaign Co., 18 49 5 21 450 25 0 25 750 74 11 10 180 Funds as required will be covered by a contract work order which will be charged against funds allocated for each such project. A schedule of the bids received has been filed with the secretary of the board. It is further recommended that the comptroller be authorized to approve work orders under these cost-plus contracts up to $25,000 for each project. Such work
| |