1983]

UNIVERSITY OF ILLINOIS

237

grading the fire protection system in the Eye and Ear Infirmary and the University of Illinois Hospital at the Health Sciences Center, Chicago, the award being in each case to the low bidder on its base bid: Division I — General Simpson Construction Co., Bellwood Division II — Plumbing David E. McDaniel Co., Inc., Valparaiso, Indiana Division V—Electrical Monarch Electric Construction Co., division of Bernard N. Lane Company, Chicago Total Base Bid $46 681 8 768

29 795 $85 244

A schedule of the bids received has been filed with the secretary of the board for record. Funds are available in the Hospital Income Fund.

On motion of Mr. Cobb, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Howard, Governor Thompson. (The student advisory vote was: Aye, Mr. Cobb, Miss Forsyth; no, none; absent, Mr. Bandala.)

Award of Contracts for Solar Water Heating System, Biologic Resources Laboratory, Chicago

(18) On October 15, 1981, the Board of Trustees approved a recommendation to accept a federal grant of $1,456,933 under the National Energy Conservation Policy Act of 1978. Bids were received on April 21, 1983, for the construction of one of the conservation projects authorized within the third cycle of the program. The president of the University, with the concurrence of the appropriate administrative officers, recommends award of contracts for the installation of a solar heating system for domestic water in the Biologic Resources Laboratory at the Health Sciences Center, Chicago, the award being made in each case to the low base bidder. The laboratory building has a high rate of energy utilization due to ventilation and sanitary standards for animal research facilities. This project will provide a solar energy system for generating domestic hot water. The work will consist of the installation of 84 solar collector panels on the east roof of the building, connected to the existing hot water systems to provide hot water on days when solar collection is inadequate. By decreasing the demand for steam, the energy savings should recover the costs in 12 years. The work will begin in June and is scheduled for completion in October 1983. The recommended contracts are as follows: Mechanical Stratton Mechanical Industries, Inc., Addison Electrical Monarch Electric Construction Co., division of Bernard N. Lane Company, Chicago Total Base Bid $131 680

12 606 $144 286

A schedule of the bids received has been filed with the secretary of the board for record. Funds are available from the Federal Energy Conservation Grant.