UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 223]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 223 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



214

BOARD OF TRUSTEES

[April 21

ard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Cobb, Miss Forsyth; no, none.)

Contracts for Repairs, Minor Remodeling, and New Construction, Fiscal Year 1984 (and Withdrawal of a Bid), Urbana

(26) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for repairs, minor remodeling, and new construction at the Urbana-Champaign campus for the period July 1, 1983, through June 30, 1984. T h e contractors' bid on percentages to be added to an estimated volume of material, labor, and subcontracts. T h e awards recommended arc to the low bidders. T h e contracts are for individual projects estimated to cost less than $25,000. T h e University will have the option to extend these contracts for an additional year on the same terms and conditions, subject to approval by the Board of Trustees. Percent for Material General Lyman-Wikoff, Inc., Champaign Electrical Downtown Electric Company, Urbana Plumbing A & R Mechanical Contractors, Inc., Urbana Heating, Piping, and Refrigeration A & R Mechanical Contractors, Inc., Urbana Ventilation and Distribution System for Conditioned Air R. H . Bishop Company, C h a m p a i g n . . Plastering, Plaster Patching, and Repairs E. T. Drewitch, d / b / a E. T . Drewitch Plaster Contractor, Urbana Insulation Sprinkmann Sons Corporation of Illinois, Peoria Lightning Protection Samuel J. Ollesh, d / b / a Midwest Lightning Rods, Decatur 4 Percent for Labor 29.5 Percent for Subcontracts 5 Total Estimated Fee Payments $33 200

8

39

5

12 600

5

47

2

9 730

5

47

2

14 450

6

49

5

13 100

5

25

0

25 750

14.9

72

10

9 734

20

38.4

6

7 280

Funds as required will be covered by a contract work order which will be charged against funds allocated for each such project. A schedule of the bids received has been filed with the secretary of the board for record.