UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 222]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 222 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1983]

UNIVERSITY OF ILLINOIS

213

$ 89 088 11 341 $124 820

Ventilation Pullman Construction Industries, Inc., Chicago Electrical Fries Walters Co., Hillside Total

A schedule of the bids received has been filed with the secretary of the board for record. Funds are available from the Federal Energy Conservation Grant. O n motion of M r . Stone, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, M r . H a h n , Mr. Howard, M r . Logan, Mr. M a d d e n , Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. ( T h e student advisory vote was: Aye, M r . Bandala, Mr. Cobb, Miss Forsyth; no, none.) Contract for Contractual Building Services, College of Dentistry, Chicago (24) The president of the University, with the concurrence of the appropriate administrative officers, recommends, subject to the availability of funds, the award of a contract for $177,372 to Beverly Building Maintenance Co., Inc., Oak Lawn, the low base bidder, to provide contractual building services in the College of Dentistry at the Health Sciences Center, Chicago, during Fiscal Year 1984. Funds will be included in the Chicago campus Physical Plant Institutional Funds Budget Authorization Request for FY 1984 to be submitted to the Board of Trustees. (The scope of the project will consist of providing supervision, labor, and supplies adequate to clean and sanitize selected building areas at regular intervals. Daily general cleaning services will be performed in designated public and patient areas, washrooms, and classrooms. Other areas of the building will be cleaned on an alternate day basis.) O n motion of Mr. Stone, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. H a h n , Mr. Howard, M r . Logan, Mr. Madden, Mrs. Shepherd, M r . Stone; no, none; absent, Governor Thompson. ( T h e student advisory vote was: Aye, Mr. Bandala, M r . Cobb, Miss Forsyth; no, none.) Contract for Food Service Equipment, Student Residence Hall, Chicago (25) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $112,900 to M.L. Rongo, Inc., Melrose Park, the low base bidder, for the purchase and installation of food service equipment for the food service area on the first floor of the student residence hall at the Health Sciences Center, Chicago. (This is the foodservice-equipment portion of the first phase of a project to improve the public areas on the first floor of the building.) Funds are available from the University of Illinois Auxiliary Facilities System Revenue Bonds, Series N. O n motion of Mr. Stone, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, M r . H a h n , Mr. How-