152

BOASD OF TRUSTEES

[ J a n u a r y 17

Clinton Street), Chicago campus. T h e award in each case is to the low base bidder. Division I — General John Edward Construction Company, Downers Grove Division A &H Division Hanley II — Plumbing Plumbing & Heating Co., Inc., Chicago IV •—Heating, Ventilating, and Air Conditioning Mechanical, Inc., Chicago Base Bid $159 800 38 260 211 000 I l l 335 $520 395

Division V — Electrical Hoffman Electric Company, Rosemont Total

The project involves the conversion of the building to a laboratory/office facility for the Department of Chemical Engineering. The first phase includes making electrical and mechanical improvements for the entire building, replacing the 27year-old roof, and remodeling 2,000 square feet of the first floor to provide wet laboratories. Funds are available from the State appropriations funds and institutional funds budgets of the Chicago Physical Plant. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Day, M r . Forsyth, Mrs. Gravenhorst, Mr. H a h n , M r . Howard, M r . Logan, M r . Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. ( T h e student advisory vote was: Aye, M r . Lamm, M r . Pittman; no, none.) Contracts for Air Conditioning, Digital Computer Laboratory, Urbana

(19) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts to improve the air-conditioning system at the Digital Computer Laboratory Building at the Urbana-Champaign campus. T h e award in each case is to the low bidder on its base bid plus the indicated alternate. Mechanical Base Bid A & R Mechanical Contractors, Inc., Urbana $179 800 Electrical Potter Electric Service, Inc., Urbana Total 27 300 Alternate I $4 200 N/A Total $184 000 27 300 $211 300

Funds are available in the Fiscal Year 1985 institutional funds budget of the Operation and Maintenance Division of the Urbana-Champaign campus. This project will provide for the present and future demands for air-conditioning in the laboratory. Two existing cooling towers in the building's basement are inefficient and create high humidity and water problems. These will be replaced with more efficient units that will have lower maintenance costs. T h e project also includes the installation of an additional 125-ton, air-cooled chiller and a secondary pumping system, upgrading the electrical system for the new air-conditioning equipment, and a safer, easier access to the roof. Alternate 1 consists of a new roof hatch with steps. A schedule of the bids received has been filed with the secretary of the board for record.