1985]

UNIVERSITY OF ILLINOIS

151

On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contracts for Remodeling Science and Engineering Laboratories, Chicago

(17) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts to convert 2,000 square feet of instructional laboratories and offices in the Science and Engineering Laboratories, Chicago campus, to a research laboratory and offices for the Department of Chemistry. The award in each case is to the low base bidder plus acceptance of the indicated deductive alternates. 1 Division I — General H. Ray Anderson & Associates, Inc., Chicago Base Bid $29 923 Ded. Alt. No. 1 N/A Ded. Alt. No. 2 N/A Ded. Alt. No. 3 N/A Total $ 29 923

Division III — Heating and Refrigeration G. F. Connelly Co., Inc., Chicago 25 924 Division IV — Ventilating and Air Conditioning Hanley Mechanical, Inc., Chicago 57 000 Division V — Electrical Goulding Electrical Construction, Inc., Wheeling 52 000 Total

N/A

N/A

N/A

25 924

N/A

N/A

N/A

57 000

(2 640)

(5 280)

(3 960)

40 120 $152 967 all required space and a

T h e project will create a large research laboratory including services, furniture, and an instrument room; refurbish existing office support area; and provide air conditioning. Funds for this "Renovation for Excellence" project are available Year 1985 State Appropriated budget of the Chicago Physical Plant. A schedule of the bids received has been filed with the secretary for record.

in the Fiscal of the board

On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contracts for Upgrading Hunt Building, Phase I, Chicago

(18) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the first phase of a project to upgrade the recently acquired Hunt Building (810 South

1

A schedule of the alternates is filed with the secretary of the board (or record.