46

BOARD OF TRUSTEES Room 528—Omit compressed air piping to dental unit, as per Change No. 3, 6/5/36, deduct Room 616—Rough in Y\" compressed air line to dental unit, as per Change No. 12, 7/1/36, add. . . . Room 725—Rough in %" compressed air line to table T-104 as shown on drawing EQ-7, as per Change No. 16, 7/20/36, add F o r omission of alteration work in rooms 453, 454, 4SS, and 456, Research Building, covered by Alternate Bid No. 4 of the original proposal, d e d u c t . . _

[September 30

II 33 23 99

28 28

$

Total deduction N o extension of time required. Change Order No. 5 Revision of steam piping to provide for future installation of two zone control valves, as per Change No. i-B dated July 20, 1936, add N o extension of time required. Change Order No. 6 Room 825 Omit the ¥$" compressed air and vacuum supplies to the "T-27" tables. Provide roughing-in of Y\" compressed air to two dental units in north end of room. In accordance with Change No. 18-A dated July 28, 1936. N o change in contract price. Room 923 Relocate the steam and return stubs for sterilizers from the south to the west partition and for roughing-in steam and return connections to the sterilizers along the north partition. In accordance with Change No. 19 dated September 18, 1936, add $ N o extension of time required. IV. Ventilating Contract Change Order No. s Furnish necessary labor and material required to complete alterations and additions to ventilating work in the Photographic Department, present Research Laboratory Building, as shown on Architects' drawing No. 60. All in accordance with proposal dated August 17, 1936, in the amount of No extension of time required. Change Order No. 3 Omit exhaust duct and riser, room 134, as per proposal dated July 27, 1936, deduct No extension of time required. Change Order No. 4 F o r installation of 1 6 x 6 " exhaust duct connections for hoods along north side of rooms 626 and 722 and increasing riser E # 4 / 8 to 16 x 10" and 16 x 18" for rooms 626 and 722 respectively.

117 02

$ $

544 563 117 446

00 14 02 12

$

747 29

11 25

$

842 00

$

9 08