1936]

UNIVERSITY OF ILLINOIS

43

Change Order No. 8 Furnish necessary labor and material required to complete plumbing work in the Photographic Department, present Research Laboratory Building, as shown on Architects' drawing No. 60. All in accordance with proposal dated August 25, 1936, in the amount of No extension of time required. Change Order No. 9 F o r changes in plumbing work in rooms 28, 13, and 14, as per proposal # 1 9 dated July 8, 1936, a d d . . . F o r changes in plumbing work in room 13 as per proposal # 2 6 dated August 18, 1936 For changes in plumbing work in room 181 as per proposal # 2 8 dated July 2, 1936, add F o r changes in plumbing work in rooms 13s and 134 as per proposal # 3 0 dated July 28, 1936, d e d u c t . . $ For changes in plumbing work on the fourth floor as per proposal # 16 dated July 11, 1936, add For changes in plumbing work on the fifth floor as per proposal # 1 7 dated July 9, 1936, add F o r changes in plumbing work on the sixth floor as per proposal # 2 2 dated July 16, 1936, deduct F o r changes in plumbing work on the seventh floor as per proposal # 2 3 dated July 16, 1936, d e d u c t . . For omission of alteration work in rooms 453, 454, 455, and 456, Research Building, covered by Alternate Bid No. 1 of the original proposal, deduct

$

856 30

$ No charge

86 90

85 50 96 40 924 60 151 25 353 65 49 65

450 00 949 70

Total additional

cost

1 248 25 949 70 $ 298 55

No extension of time required, Change Order No. 10 Omit installation of the old Audiffren Refrigerating machine and brine tank as specified on pages 45 and 46 of the original specifications under heading of "Present Audiffren Refrigerator and Brine Tank." Drinking water storage tank and covering for same also to be omitted. Furnish and install, in lieu of the above, one Baker Refrigerating Unit Model F150, capacity 18,320 B.T.U. per hour, complete with lj4 H . P . 3 phase, 60 cycle, 220 volt motor and drinking water tank (pressure type) 24" diameter by 48" high, 3/16 steel, galvanized inside and out. Tank to have dished heads and 1" drain. Installation to include one magnetic valve to shut off liquid supply when machine stops and one thermostat to control temperature in water tank. All to be in accordance with specifications of Burge Ice Machine Company, for the net additional sum of N o extension of time required.

$

49500