EXTRACTED TEXT FROM PAGE:



I936]

UNIVERSITY OF ILLINOIS

41

Change Order No. 11 Price allowance for hardware $12 500 00 Quotation of Midwest H a r d w a r e dated J u n e IS, 1936 $ 9 650 00 Items from supplementary quotation dated June 29, 1936, including the following items at additional cost: 1. VonDuprin Set # I 4 } 4 B 2 for doors 405 to 406 75 40 2. Provision of lock $7738 on doors 6 to 60, 106 to 160, 206 to 260, and 306 to 360 19 00 3. Addition of # 3 2 4 ^ deadlocks and # 6 3 flushbolts for doors 101 to 105, 102 to 104, 1 to 5, and in 4 18 00 4. Provision of push plates on both sides double acting fly doors 1800 5. Provision of # 1535 latch on first floor dressing room doors—4 @ $1.05 4 20 9 784 60 Net Credit $ 2 715 40 Note: It is also understood that Norton door checks will be furnished throughout except "Hercules" holders will be provided in lieu of holder a r m s ; that emergency keys will be provided with #1535 locks; and that a list of all items by catalog number (samples if requested) will be furnished the Physical Plant Department of the University in connection with all items not covered by catalog number in the specifications prepared by the Architects, for approval in advance of placing orders for same. N o extension of time required. Change Order No. 12 F o r enlarging the pit in Amphitheatre No. 412 by omission of lower step and complete finishing of remaining space. No change in contract price. N o extension of time required. Change Order No. 13 W h e r e a s the original masonry specifications, paragraph 28, page 11, read as follows: "Floor Load Test.—This Contractor shall furnish all materials and labor required in making a floor load test on a typical reinforced concrete panel as required by the City Building Department, providing twice the load for which the floor is designed. This test shall be conducted and checked in accordance with directions from Chief Building Inspector, and in the event that test is omitted, proper allowance shall be credited to the Owner." And whereas the quality of the construction of the building is such that the Owner and Architects believe a floor load test to be superfluous, it is now desired to omit this floor load test at a credit of $ 125 00 No extension of time required.