UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1938 [PAGE 223]

Caption: Board of Trustees Minutes - 1938
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 223 of 1002] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1937]

UNIVERSITY OF ILLINOIS

221

ing have been approved and the following resolution is offered to ratify said actions: Be it resolved, that the Board of Trustees hereby approves and ratifies the action of the President of the University in authorizing contract change orders on the second unit of the Medical and Dental College Laboratories Building. I. General Contract Change Order No. 24 Allowance in General Contract for Lighting Fixtures $15 000 00 Proposal from E d w a r d Electric Company, dated March 26, 1937, for furnishing and installing complete, all lighting fixtures in accordance with specifications and schedule, dated March 10, 1937, in amount of 14 817 00 Net Credit $ 183 00 (This is to replace the Change O r d e r of the same number reported to the Board on March 9.) Change Order No. 27 Rooms 120 and 103 Omit metal backs and deflectors in radiator enclosures, deduct the sum of $ Room 412 Omit radiator grilles, sheet metal and asbestos enclosures and deflectors back of grilles, deduct the sum of Total Credit $ Replace grille space with art marble, add the sum of Net Credit $ Change Order No. 28 For substituting terrazzo base for wood base in Room #1301, add the sum of $ F o r furnishing 116 ceiling access panels at $6.90 each, add the sum of Total.. ^ $

Si 00 179 230 72 158 00 00 00 00

53 00 800 40 853 40

Change Order No. 29 Omission of Cash Allowance in General Contract for Finished Grading, Planting, and Sodding—$3,000 plus 2 % profit, deduct the sum of $ 3 060 00 Omission of grounded wire mesh caging called for in paragraph 2 5 ^ of the Metal Furring, Lathing and Plastering Specifications, deduct the sum of 100 00 $ 3 160 00 II. Electrical Contract Change Order No. 11 Room No. 216 F o r installing 3400 watt receptacle and new home run of two No. 6 feeders in 1" conduit in lieu of 1800 watt receptacle and home run of two No. 10 feeders in J4" conduit. F o r substituting one 60A breaker for a 30A breaker in lighting distribution cabinet # 2 L - 3 circuit # 3 1 . Add the sum of $ Room No. 446 For furnishing material and labor required to extend the feeder to new location of window operator. Add the sum of $

39 77 22 33 62 10

On motion of Mr. Mayer, the resolution was adopted as recommended.