1937]

UNIVERSITY OF ILLINOIS

199

Clinics Nos. 622-623-718-719-832-833 In each room— Omit 12 C 14' a t 13.24 $158 88 Credit Add 16 C 12* a t 9.59 153 44 Extra Net credit each room $ 5 44 Net Credit, Six rooms a t £5.44 $ 32 64 Surgical Amphitheatre No. 412 Add 5 Holophane CF-300% a t $15.93 ? 79 65 Studio No. 434 Omit 5 D 20" at 38.06 $190 30 Credit Add 5 A3 1 4 ' a t 7.10 35 50 Extra Net Credit $154 80 All C and E fixtures shall be of such length t h a t mounting height will be 7'o' above floor and all such fixtures shall have chain hangers in place of semi-rigid hangers specified a t no change in contract price. The finish of all fixtures shall be as originally specified. For all materials and labor required to furnish and install a Scialitic " B " lighting fixture in Room #412, a Scialitic " B " lighting fixture in Room # 4 4 4 and a Scialitic " O A " lighting fixture in Room # 408, complete with all details as specified and furnished by The Burrows Company, connected up to outlets and ready for operation for the sum of $2,576.00, including Sales Tax. Lighting Fixture Proposal $14 230 00 Total Additions 2 655 65 $16 885 65 Total Deductions 393 32 Lighting Fixture Sub-Contract $16 492 33 Allowance in General Contract 15 000 00 Amount of this Change Order $1 Change Order No. 25 For the omission of photo murals in Rooms 520 and 1202, deduct the sum of $1 Material for painted murals, add the sum of Net Credit $1 Change Order No. 26 Furnish and install three beams and concrete strut in connection with the arch over passageway a t the west end of building, add the sum of I I . Plumbing Contract Change Order No. 16 For substituting Kelvinator Type EB-48 drinking water coolers as per attached proposal No. 7 dated November 4, 1936. N o change in contract price. III. Ventilating Contract Change Order No. 6 For making changes in Fan Systems Nos. 1 and 2 as shown on drawing No. 61 and covered by our letter dated October 29, 1936, excepting as follows: All duct work, casing and equipment shall be omitted between automatic louvre damper in fresh air intake and supply fan S-i except t h a t the automatic air filter shall be furnished and erected on concrete pedestal where shown on drawing No. 61, add the sum of

492 33

305 00 187 06 117 94

80 00

758 70