UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1906 [PAGE 113]

Caption: Board of Trustees Minutes - 1906
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 113 of 524] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1905J

PROCEEDINGS OF THE BOARD OF TRUSTEES.

87

get along without expending perhaps $12,000 on new equipment and changes. Some things may be left until next summer, but some shou/ld be done this summer. I estimate that the cost of the work which should be done this summer will be about as follows:

Purchase ahd installation of new water-tube boiler of about 250 H. P . to replace old fire-tube boiler of 120 H. P Extension of coal and ash handling machinery and coal storage bins in front of the New Stirling boilers New supplies: Feed pump, safety valves, blow-off valves, exhaust head, oil extractor, small tools Total.. $5,000 00 2,000 00 1,000 00 $8,000 00

I recommend that authority be granted to purchase and install the above, apparatus. Further expenditures which are absolutely necessary can be determined when it is known at what date the new auditorium will be finished and ready for heating. Yours respectfully,

L. P. BRECKINRIDGE,

Professor of Mechanical Engineering. U p o n the recommendation of the Committee on Buildings and Grounds, $8,000 was appropriated for the purposes named in P r o fessor Breckenridge's letter, and the work was put in charge of the Committee on Buildings and Grounds.

REPAIRS.

A communication was received from the Superintendent of Buildings recommending repairs and appropriations therefor as follows :

Painting partitions, revarnishing doors, stairways, windows, seats, etc F o r cutting about six inches off bottom of partitions where they ar e resting on concrete floors and are rotting Armory= F o r repairs to roof gutters . F o r painting roof Wood Shops— Painting inside Repairs to plastering Repairs to gutters which are rusted out . Metal Shops— Painting inside Renewing rusted out down spouts Agricultural Building— Painting outside woodwork . Painting inside woodwork.. Horticultural Green House— Painting outside Painting inside Observatory— Painting outside Painting inside and kalsomining. Electrical Laboratory— Kalsomining'and painting inside. Green House— Painting inside and outside Hydraulic Laboratory— Painting and plastering Repairs to guttter,s

$100 00 50 00 $150 00 50 001 $25 00 25 00 60 00 $15 00 25 00 $100 00 85 00 $85 00 65 00 $50 00 15 00 $150 00 200 00

110 00 40 00 185 00 150 00 65 00 40 00

^160 00 *. $ 25 00 160 00| 185 00