EXTRACTED TEXT FROM PAGE:



1899.]

PROCEEDINGS OF THE BOAED OF TRUSTEES. MATERIAL ON GROUND.

23T

Brick Stone die course and sills Framing lumber Cast iron Steel Mill work, frames

550,000 at $6 25 155x4 cu. feet at 1 10 28,000 ft. at 19 00 30,000 ft. at 20 00 23,0001b. at 02*4 15,0001b. at 03*2 225 at 3 0®

$3,437 00< 160 77 532 00 600 00 517 50 539 00 675 00$6,461 29^

On this, 85 per cent, or $14,095.61, has been paid to Messrs. Jobst & Sons, of which $8,603.53 is for completed work, and $5,492.08 is for material on< ground.

FOR DRAINAGE SYSTEM TO BAUMGARTEN BROS. Completed work Material on ground , , $402 80' 158 70 $561 50> On t h i s has been paid 85 per cent, on completed work Account material on ground $342 38 134 89 $477 27:

TOTAL EXPENDITURES TO DATE. To V. J o b s t & Sons $14,095 61 477 27" $14,572 88-

Respectfully submitted,

J. C. LLEWELLYN, Architect.

T h e C o m m i t t e e on I n s t r u c t i o n , which was directed to i n q u i r e i n t o t h e desirability of offering free tuition, asked for further t i m e a n d t h e r e q u e s t was g r a n t e d . T h e C o m m i t t e e on A g r i c u l t u r e s u b m i t t e d t h e following r e p o r t w h i c h was a d o p t e d a n d a p p r o p r i a t i o n s were m a d e as t h e r e i n r e c o m mended.

DECEMBER 19, 1899.

To the Board of Trustees of the University of Illinois. Your Committee on Agriculture respectfully recommends that the sum of $100 be appropriated for repairs and, lumber at the barns and that $60.00' more be allowed to complete the fence on the north farm. Your Committee also recommends the appropriation of $18.75 for rebuilding the cistern. The foregoing sums are to be paid from the State appropriation for repairs and maintenance of barns.