Caption: Board of Trustees Minutes - 1992 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1993] UNIVERSITY OF ILLINOIS 241 Funds are available from the Auxiliary Facilities System Repair and Replacement Fund. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record. On motion of Dr. Bacon, this contract was awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.) Contracts, 50 Gerty Drive Building, Urbana (21) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the remodeling of and addition to the 50 Gerty Drive building at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General Broeren-Russo Construction, Inc., Champaign Base Bid Alt. G-l Alt. G-2 $1 028 500 19 634 23 500 $1 071 634 Division II — Plumbing Reliable Plumbing & Heating Company, Savoy Division III — Heating, Piping, Refrigeration, and Temperature Control A & R Mechanical Contractors, Inc., Urbana Division IV — Ventilation and Air Distribution A & R Mechanical Contractors, Inc., Urbana Division V — Electrical Coleman Electrical Service, Inc., Mansfield Base Bid 123 235 Base Bid 186 000 Base Bid 153 225 Base Bid Alt. E-2 359 975 3 208 363 183 Division VI — Fire Protection F. J. Murphy & Sons, Inc., Springfield Total Base Bid 47 000 $1 944 277 This project will provide a new facility to house the combined functions of almost all of the Administrative Information Systems and Services (AISS) units currently at the Urbana campus. The various AISS units are now located at several sites, and they will be consolidated at the 50 Gerty Drive building. The project consists of the remodeling of 20,000 square feet in the basement
| |