UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1992 [PAGE 254]

Caption: Board of Trustees Minutes - 1992
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 254 of 628] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



242

BOARD OF TRUSTEES

[May 14

and first floor and construction of a 12,000 square foot addition to create new offices and conference rooms. It is also recommended that the firm of Isaksen and MatzdorfF, Architects, PC, Urbana, be employed for the construction phase of the project. The firm's fee for construction administration is a fixed fee of $35,000; and the firm's fee for construction on-site observation is on an hourly basis, with the total not to exceed $51,000; plus authorized reimbursable expenses which are estimated to be $8,000. Funds are available from the institutional funds budget of Central Administration. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Dr. Bacon, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contracts, Remodeling for Department of Geology, Natural History Building, Urbana

(22) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling for the Department of Geology, Natural History Building at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General W. Commercial Builders, Inc., Urbana

Base Bid $153 2 7 3 Alt. G-l .... 8 709 6 286 Alt. G-2 .... 13 767 Alt. G-3 .... Alt. G-4 . . , . 5 446 $187 481

Division II — Plumbing Hart & Schroeder Mechanical Contractors, Inc., Champaign

Base Bid Alt. P-3 ....

43 000 1 525 44 525

Division III — Heating Nogle & Black Mechanical, Inc., Urbana

Base Bid. Alt. H-3 .

93 624 500 94 124

Division IV — Ventilation T'nT Mechanical Contractors, Inc., Urbana

Base Bid

90 811