Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 201]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 201 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



190

BOARD OF

TRUSTEES

[February 19

amounts of $7,500 to $10,000, and a report of bids taken in behalf of the Capital Development Board. A copy of this report is filed with the Secretary. This report was received for record. The Comptroller's Monthly Report of Contracts Executed (22) The Comptroller's monthly report of contracts executed was presented. Chicago Circle Change Orders

With Whom T a l Rauhoff, I n c . Purpose Cost-plus contract — general work: R e p l a c e m e n t of swimming pool windows in Physical Education Building Regrout the swimming pool in Physical Education Building Amount to be Paid by the University $ 11 397 9 645 5 21 042

Total

Medical Center New Contracts

With Whom State of Illinois — D e p a r t m e n t of M e n t a l H e a l t h : N o . 210 N o . 213 D e p a r t m e n t of Public H e a l t h N o . PHG00107 Institute for Environmental Quality N o . 90.002 Total Purpose Amount to be Paid to the University

Operation of a child psychiatry clinic Operation of an adult psychiatry clinic Provide laboratory services for kidney transplantations Evaluation of health hazards caused by heavy use of nuclear power reactors in Illinois

S 85 000 95 905 50 000 180 000 S410 905

New Contracts

With Whom Langewisch & W a r m e r P . G. H e r m a n Smith Associates Total Purpose Professional educational service at Rockford School of Medicine Prepare a Master Overview Network Analysis of the 500-bed replacement hospital t

Amount to be Paid by the University S 13 475 9 500 % 22 975

Change Orders

With Whom Purpose Economic analysis of pollution control studies University of Chicago — Argonne National Laboratory 31-109-38-2823 Total Amount to be Paid to the University S 38 000 $ 38 000 Amount to be Paid by the University % 7 897 S 7 897

Change Orders

With Whom T a l Rauhoff, I n c . Total Purpose Cost-plus c o n t r a c t — general work: Demolition and removal of Nurses A p a r t m e n t Building

Urbana-Champaign New Contracts

With Whom C o u n t y of El Paso, Texas Purpose Provide a master plan for corrections facilities for El Paso, T e x a s Amount to be Paid to the University % 12 425