UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1974 Version B [PAGE 14]

Caption: Board of Trustees Minutes - 1974 Version B
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 14 of 680] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



6 _ . ,

BOARD OF TRUSTEES

[Juty Estimated cost

19

Pro ect

>

Permanent Power to P a r k i n g Structure No. 1 $ Subtotal, Utilities ($1 6. Remodeling and Rehabilitation Remodel Office of Instructional Resources in Library and Burnham Hall Miscellaneous Remodeling in Science and Engineering Lab and Science and Engineering South Improvement of Lighting Levels in Lecture Center Modifications Required by Occupational Safety and Health Act, Phase 1 •Safety Valves for Heating System Subtotal, Remodeling and Rehabilitation ($ 7. Site Improvements •Lighting Drives and Walks (Classroom Office — Student Services Building) Demolition of Racine Avenue Building Demolition of Roosevelt Road Building Subtotal, Site Improvements ($ 8. Planning Long-Range Institutional Development Subtotal, Planning ($ Total, Summary of Capital Requests $10 Medical C e n t e r C a m p u s : Classified L i s t of P r o j e c t s I n c l u d e d in t h e Capital R e q u e s t for F Y 1974'

Pro ect

80 000 100 000) 46 000 47 200 45 000 500 000 70 000 708 200)

68 160 90 318

000 000 000 000)

20 000 20 000) 056 800

r,

• .

>

Estimated cost

1. Buildings, Additions, and/or Structures Bond Eligible Projects Peoria School of Medicine School of Public Health Addition to Rockford School of Medicine General Revenue Projects Facilities at Affiliated Hospitals in Peoria Area Facilities at Affiliated Hospitals in Rockford Area Facilities at Affiliated Hospitals in Metropolitan Area Subtotal, Buildings, Additions, and/or Structures 2. Funds to Complete Bond Eligible Buildings FY 1971 Projects College of Dentistry Building, Phase II FY 1972 Projects Library of the Health Sciences FY 1974 Projects Peoria School of Medicine School of Public Health Addition to Rockford School of Medicine. Subtotal, Funds to Complete Bond Eligible Buildings

1

$ 6 641 100 6 201 900 3 515 700 [ 1 [ 1 [ 3 ($16 500 500 000 358 000 000 000 700)

55 000 40 000 1 18 1 116 500 500 000 000)

($

Projects preceded by an asterisk were previously approved by the Board of Higher Education but deferred. The amounts for FY 1974 are often different from the earlier figures for various reasons: cost increases, changing- requirements and changes in the scheduling of cashflow needs for projects requiring funding over two or more fiscal years. 2 These funds would be appropriated to the Board of Higher Education to support medicaleducation programs in the affiliated hospitals of the University of Illinois. This request is made in accordance with the stated policy and recommendations of the Board of Higher Education — Education in the Health Fields for State of Illinois, June 1968 (see p. 23).