UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1954 [PAGE 1144]

Caption: Board of Trustees Minutes - 1954
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1144 of 1923] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1953]

UNIVERSITY OF ILLINOIS Contract Changes

Amount to be Paid to the University

$ 6 700 00 2 000 00 140 000 00 7 525 00 18 9S4 00

1141

With Whom Illinois Coal Strippers Association Illinois Farm Supply Company Reconstruction Finance Corporation United. States Air Force AF i8(6oo)-8o United States Air Force

AF I8(6OO)-392

Purpose Strip mined areas study Trace elements in soils and crops study Synthetic rubber study Survival rations as related to the efficiency of young men under temperate conditions study Transonic and supersonic flow of a real fluid at abrupt increases in cross section study Semi-conduction study Micro-mechanisms of fracture of ferrite in tension impact study Theoretical statistics study Kinetics of anode films study Investigation of phenomenon of super-conductivity study Conduction of electricity in solids study Intensity of surface precipitation by radar instrumentation study Survival of salmonella and shigella species exposed to low temperatures study Endocrine and neural factors in the acute shock response to overwhelming emotional or physical stress study Radiation damage in solid materials study Anaerobic digestion of sewage sludges study "Restricted" Civil Engineering "Confidential" Civil Engineering Electron beam study Digital computer components study Radio frequency spectroscopy study Linear complexes of topological spaces study Properties of dielectric and semiconducting solids study Numerical analysis study Solid state and surface physics of semiconductors study

Date

March 20, 1953 September 1, 1953 June 30, 1953 June 5. 1953

M a y 12, 1953

United States Air Force AF 33(038)-li644 United States Army DA-11-022-ORD-602 United States Army DA-11-022-QRD-881 United States Army DA-11 -02 2-ORD-93 9 United States Army DA-i 1-022-QRD-992 United States Army

DA-II-022-ORD-IOOI

82 582 00 8 490 97 17 375 8S 14 289 00 31 450 00 20 857 00 42 612 00 5 828 00

1

M a y 29, 1953 August 26, 1953 M a y 29, 1053 June 19, 1953 M a y 29, 1953 June 29, 1953 July 23, 1953 July 10, 1953

United States Army DA-36-039 SC-42446 United States Army D A-49-007-MD-216 United States Army DA-49-007-MD-381 United States Atomic Energy Commission ATU1-O-182 United States Atomic Energy Commission AT (n-i)-2iS United States Navy NObs-55507 United States Navy NObs-55889 United States Navy N6ori-7i, Task Order 19 United States Navy N6ori-o7i24 United States Navy N 6011-07126 United States Navy N60H-07127 United States Navy N6ori-07i29 United States Navy N6ori-07i3o United States Navy N6ori-o7i40 With Whom Clyde E. Gates Construction Company (General work)

1

33 096 00

August 31, 1953

108 267 00

June 16, 1953

21 500 00

June 23, 1953

20 000 00 9 500 oo1 30 000 00

June 3, 1953 July 2, 195 3 March 31, 1953

11 740 00 34 000 00 1 454 00 17 200 00 22 226 00

June 9. 1953 May 28, 1953 June 9- 1953 June 22, 1953 March r5, 1953 June i i , 1953

42 634 00

Adjustments

Made in 1951-1952 Cost-Plus

Contracts

Date August 7. 1953

Purpose Mechanical Engineering Laboratory, heater research

A mount $ 234 83

Deduct.