UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1954 [PAGE 1143]

Caption: Board of Trustees Minutes - 1954
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1143 of 1923] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1140

Item Hospital textiles

BOARD OF TRUSTEES

Department Genera] Stores, Chicago Colleges

[October 22

Vendor Cost Whitehouse Manufacturing Co., Chicago 3 110 00 Karoll's Inc., Chicago 1 903 00 Kansas City White Goods, Kansas City, Mo. 968 5c H. Woolf and Co., Inc., 373 25 Chicago Mills Hospital Supply Co., Chicago Co 431 00)

On motion of Mr. Johnston, these purchases were authorized.

COMPTROLLER'S REPORT OF CONTRACTS (14) The Comptroller's report of contracts executed during the period September

1 t o 30, 1953. With Whom The Board of Trustees of the Decatur Public Library United States Air Force AF i8(6oo)-662 United States Air Force AF i8(6oo)-689 United States Army DA 44-i09-qm-i553 United States Army DA 49-007-MD-478 United States Department of State SCC-22309 Watseka Elementary School, Iroquois County, Illinois With Whom Cadillac Glass Company Coatings Application Corporation Eddie James, orchestra leader Purpose General survey Electronic properties of nonmetallic crystals study Properties of insulating and conducting solids study Determination of chemical changes that occur during dehydration study Factors in the development of house fly resistance to insecticides study "Restricted" Institute of Communications Research School survey Amount to be Paid to the University

$

800 00

Date September 14., 1953 May 28, 1953 May 20, 1953

10 000 00

June 30, 1953 July 1, 1953 June 18, 1953

650 00 Amount to be Paid by the University $1 620 00 2 436 00 250 for three hours $40 per half hour for additional time 2 100 00

August 31, 1953

Purpose Corridor door installation for staff apartments, Chicago Roof repairing work on Mechanical Engineering Laboratory Services at Navy Pier, September

19. 1953

Date August 18, 1953 June 1, 1953 August 31, 1953

Harlan E. Moore and Company (three contracts) State's Attorney of Champaign County (two agreements) State's Attorney of Champaign County

Roof repairing work on Smith Music Hall, Electrical Engineering Research Laboratory, and Agricultural Engineering Building Services rendered (in lieu of taxes) Services rendered (in lieu of taxes)

June 1, 1953

25 100 52 8 923 82

July 21, 1953 September 3, 1953

Leases

With Whom United States Department of Agriculture Purpose Motorized equipment used in case of fire outside the boundaries of Dixon Springs Experiment Station, Robbs, Illinois Purpose Farming equipment for use by Dairy Science Department Farming equipment for use by Physical Plant Department Amount to be Paid to the University Rates per contract Amount to be Paid by the University $ 433 33

100 24

Date July 29, 1953

With Whom Fox River Tractor Company International Harvester Company

Date July 22, 1953 April 29, 1953