UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1952 [PAGE 42]

Caption: Board of Trustees Minutes - 1952
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 42 of 1693] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



I950]

UNIVERSITY OF ILLINOIS

39

1005 West Nevada Street 15 000 Armory — remodeling 12 098 Student and staff housing •— planning 9 894 Altgeld Hall — remodeling rooms 304, 317, 319 r 478 Animal Genetics Building addition I 359 Architectural services for future buildings 408 Band Building — acoustical treatment 365 Botany Annex — greenhouse remodeling 2 226 Changes in administrative offices I 157 Civil Engineering — drafting room lighting 7 500 Commencement platform 6412 Davenport House — third floor remodeling 672 David Kinley Hall — room 420 I 389 601 East John Street — remodeling 5 302 Engineering services — fire protection 5 054 Electrical Engineering Building — remodeling room 265 2 919 Horticulture Field Laboratory — remodeling 8 741 Horticulture Field Laboratory and Dairy Manufactures — remodeling.. 15 871 Illini Hall — third floor remodeling 6 672 1110 West Illinois Street — remodeling 5 935 1206 West Illinois Street — improvements 3 195 Increase Power Plant turbine capacity 1 979 Lincoln Hall — remodeling 3 571 McCullough farm house rehabilitation 4 762 Mumford Hall — library book stacks 7 983 Natural History Building remodeling — General 2 639 Greenhouse 55 Renovation and ventilation 34 599 Rooms 154, 304, 305 176 Newly acquired property improvements 5813 Noyes Laboratory — library remodeling 6 487 Noyes Laboratory remodeling — General 4 047 Rooms 151 and 154 18 421 Room 170 52 Third and fourth floors 58 204 Renovating and modernization 87 481 Safety improvements 9 794 Parking facilities 26 345 Physics Building — electrical improvements 3 391 Physics Building — remodeling 3 080 Purchase of land 232 Staff housing — Race and Florida 4 801 Student housing construction survey 1 478 Veterinary Pathology Laboratory 1 335 Vivarium Building — Remodeling 6 145 Water supply 455 Zoology — animal sheds 18 Service building remodeling 107 234 Physics Laboratory repowering 120 318 David Kinley Hall — remodeling room 214 800 Water softener — chemistry I 300 Civil Engineering Building — remodeling rooms 112, II2A 800 Total, Urbana-Champaign (1 431 402) Chicago Professional Colleges Anatomy — dissecting tables Hospital dental clinic equipment Radiology — special equipment 2 989 18 103