EXTRACTED TEXT FROM PAGE:



1948]

10 11 12 13 14 15 16 17 18 19 20 21

UNIVERSITY OF ILLINOIS Educational Laboratories: Elementary Division — First Unit Psycho-Educational Clinic Division Journalism and Communications Building — First Unit Band Building Library Addition Hospital Addition Addition to Armory for Naval Science Student and Staff Housing Building Remodeling and Improvement Fire Station Power Plant Addition Distribution System Land Total for Urbana Campus

CHICAGO CAMPUS

143

1 100 700 1 100 585 660 700 700 5 000 I 800 250 3 500 3 300 1 300 $36 855 000 000 000 000 000 000 000 000 000 000 000 000 000 000

22 23 24 25 26 27 28 29

Hospital Addition $ 8 900 000 Dentistry, Medicine, and Pharmacy Building — Second Unit. . 6 000 000 Experimental Research Station 1 300 000 Drug Plant Research Station 650 000 Nurses Residence Hall 1 600 000 Power Plant and Distribution System 6 400 000 Building Remodeling and Improvement 620 000 Land 740 000 Total for Chicago Campus $26 210 000 Privately Financed Housing: Student Residence Hall — First Unit (2 200 000) Staff Apartments (1 800 000) TOTAL FOR URBANA AND CHICAGO CAMPUSES ? 6 3 065 000

SCHEDULE B

PRIORITY GROUP AA

The call for projects referred to the 1949-1951 biennium. However, it was only possible to include a portion of the most urgent projects in the recommendations for that biennium. For that reason the priority group AA was established. Several of these projects are of almost the same degree of urgency as those included in the recommendations for the 1949-1951 biennium. Order of listing has no significance.

URBANA CAMPUS

Addition to Chemistry Building for Organic Chemistry Music Hall Addition Food Technology Laboratory — First Unit Minor Agricultural Structures Veterinary Medicine Clinic and Hospital Unit Engineering Library Addition Educational Laboratories — Secondary Division University Press Huff Gymnasium Addition Library Addition Receiving Station and Warehouse Student and Staff Housing Building Remodeling and Improvements Physical Plant Service Building Utility Distribution System Land Total for Urbana Campus

#4 600 000 1 100 000 I 100 000 240 000 2 600 000 540 000 3 200 000 730 000 630 000 I 300 000 160 000 5 000 000 3 400 000 1 ioo- 000 950 000 720 000 #27 370 000