UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1946 [PAGE 631]

Caption: Board of Trustees Minutes - 1946
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 631 of 1528] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



624

BOARD OF TRUSTEES

[ A u g u s t 29

Illinois for the biennium of 1945-1947. T h e sources of funds for this appropriation and the classification of expenditures a r e as follows: Tax University Funds Income Total Personal services $15 441 662 $3 165 419 $18 607 081 Office expense 200 000 200 000 Travel 130 000 130 000 Contractual services 688 234 173 732 861 966 Commodities I 407 360 I 160 849 2 568 209 Equipment 680 980 680 980 Contributions t o Retirement System 479 014 479 014 Permanent improvements 180 000 180 000 Contingencies and reserve I 600 000 I 600 000 Refunds 100 000 100 000 Total $19 207 250 $6 200 000 $25 407 250 SENATE B I L L 322. An Act authorizing the Board of Trustees to issue bonds to finance the purchase Or construction of student residence halls. SENATE BILL 362. A bill amending the State Finance Act permitting the University of Illinois to retain in its treasury funds derived from the management of the student residence halls for the purpose of defraying the cost of such halls and expense incident thereto. SENATE BILL 417. A bill for an Act making appropriations for a State-wide System of Public W o r k s projects, including appropriations for projects at the University of Illinois of $16,809,000 for the following purposes: Total AbProjects on Urbana Campus propriation Power Plant addition and equipment $ 680 000 Utilities distribution systems 791 000 Sewer extensions 40 000 Telephone service extensions 38 000 Water Station improvements 120 000 Remodeling and modernization of existing buildings 143 000 Students' Residence Halls and equipment I 500 000 Chemical Engineering Building and equipment 580 000 Fine Arts Building and equipment 740 000 Electrical Engineering Building and equipment 875 000 Removal of Health Service Station to other University building; remodeling of said building, and equipment 42 000 Veterinary Building and equipment 750 000 Band Building and equipment 220 000 Library addition and equipment 315 000 Safety Code improvements 20 000 Fire protection facilities and equipment 120 000 Health and sanitation improvements 60 000 Health and Physical Education Building and equipment 2 000 000 Betatron and Physics Research Laboratory and equipment I 500 000 Animal Husbandry Laboratories and equipment 435 000 Chemical Laboratories and equipment 996 000 Mechanical Engineering Building and equipment I 102 000 Dairy Husbandry Laboratories and equipment 275 000 Purchase of buildings for student housing 140 000 Acquisition of land 127 OOP Total, Projects on Urbana Campus $13 609 000 Projects on Chicago Campus General Hospital addition and equipment 2 000 000 Atmospheric research and equipment 250 000 Utilities distribution system 400 000 Acquisition of land 50 000 Total, Projects on Chicago Campus $2 700 000 Contingencies to cover expenditures for purposes for which the amount appropriated in any item is insufficient 500 000 Grand Total $16 809 000