38

BOARD OF TRUSTEES

[September 27

( B ) Item # 2 2 2 ($602.00) in the second story deducted under both 3d and 5 of Article 3 of the contract 602 00 Total Additional $1 130 00 This is to allow credit to the contractor for certain items deducted twice in preparing contract, first, as part of the general items, and second, as detail items. Power Plant Contract Change Order No. 2 with William A. Pope Company for piping system and erection of miscellaneous equipment. Furnish and install # 1 6 gauge galvanized steel bands at all support points on the two 4" condensate return lines in new distribution tunnel in accordance with quotation dated June 13, 1940—Add Contract Change Order No. 2 with The Asbestos & Magnesia Materials Company for insulation for piping in tunnel. Omission of covering on two 4" condensate return lines, except at support points in accordance with proposal of July 26, 1940—Deduct Net Deduction (This was a part of certain omissions made by the Physical Plant Department to make available sufficient reserves to go ahead with contracts. This work will be done later by the Department.)

1 330 00

3 774 00 2 444 00

On motion of Mr. Jensen, this action was confirmed, by the following vote: Aye, Mr. Cleary, Mr. Jensen, Dr. Meyer, Mrs. Plumb, Mr. Pogue, Mr. Williamson; no, none; absent, Mr. Adams, Mr. Horner, Mr. Karraker, Mr. Mayer, Mr. Wieland.

CONTRACT CHANGE ORDERS ON P.W.A. PROJECTS (9) A recommendation from the Director of the Physical Plant Department that the following contract change orders be authorized: Mini Union Contract pany for (1) Building Change Order No. 8 with the Arthur W. Murray plumbing work. Provide plumbing connections to Food Service Equipment throughout the building, including all valves, fittings, traps, etc., as covered by quotation of August 6, 1940 $2 (2) Provide steam service connections to all Food Service Equipment throughout the building, including all traps, valves, etc., not included in other contracts I (3) This portion of change order is to cover numerous incidental changes in plumbing roughing in required by changes in detail and relocation of Food Service Equipment after original installation was completed, in accordance with quotation of July 30, 1940 3 Total Additional Com-

186 74

150 00

311 30 $6 648 04