UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1942 [PAGE 245]

Caption: Board of Trustees Minutes - 1942
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 245 of 1243] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



242

BOARD OF TRUSTEES

[April 17

United States Letters Patent No. 2,185,531, issued January 2, 1040, on Application Serial No. 183,460, filed on January 5, 1938. 2. British patent No. 527,484, issued on Joseph Tykocinski Tykociner, JakQb Kunz, and Lloyd Preston Garner, British Divisional Application Serial No. 12,614/40. T h e British patent is based on United States Letters Patent No. 2,237,242, which will issue April I, 1941, on Application Serial No. 294,652, filed September 13, 1939. CONTRACT CHANGE ORDERS ON P . W . A . PROJECTS (6) I report for record approval of the following contract change orders: Jllini Union Building Change Order No. 13, contract with Phillips, Getschow Company for heating, ventilating, and air conditioning. (1) Additional costs due to expanded size of Compressor Room and subsequent rearrangement of equipment in Compressor Room a r e a . . . .$2 190 36 (2) Additional costs involved in providing welded fittings not called for under specifications. . . 690 52 (3) T o allow contractors 15 per cent not included in Item No. 1, Change Order No. 12, in connection with changes in air filters 15 00 "$2 895 88 (4) Credit on substitution of stamped for cast brass wall and ceiling plates 3?__22 Net additional cost This change order was approved by the Executive Committee. Change Order No. 17, contract with English Brothers for general work. (1) Change in material for mullion between Tavern and Main Kitchen $ 16 10 (2) Reimbursement for replacement of cork ceiling in Vegetable Room 112 50 128 60 (3) Omit opal glass in connection with concealed lighting fixtures in ground story (Deduction) 69 30 Net additional cost Change Order No. 18, contract with Wadeford Electric Company for electrical work. (1) Increased cost of wiring to provide for 15 H.P. (elevator No. 81) motor instead of 10 H.P. as originally specified $ 88 00 (2) Credit on omission of wiring of fixtures called for in specifications 70 00 Total additional cost

$2 865 88

$

59 3°

$

18 00

ADJUSTMENTS IN BUDGET FOR 1 9 4 0 1 9 4 1 (7) In approving the budget for 1940-1941 the Board authorized the President of the University to make such changes and adjustments as are necessary. Pursuant to this authorization the following adjustments were made in the operating budget during the fiscal quarter ending March 31, 1941: Permanent additions to current budget: University Counsel salaries $ 200 Registrar's Office salaries 120 Library wages 275 Library salaries 280 $ 875 Temporary additions to current budget: Chemistry salaries 1 000 English salaries 750 Spanish and Italian salaries I 950 3 700 Total Additions to Budget $4 575