162

BOARD OF TRUSTEES

Additional anchors and supports for 12" exhaust headers near entrance to tunnel—extra Revision of soot blower lines and drains—extra Installation of city water piping to generators for fire protection—extra Total Extras Net Credit

[January 22

136 85 639 20 418 99 $ 1 696 g 280 67

On motion of Mr. Davis, these changes were authorized.

POWER PLANT CONTRACT CHANGE ORDER (15) T h e Director of the Physical Plant Department recommends approval of Change Order No. 4 in the contract with the Allis-Chalmers Manufacturing Company for equipment for the new Power and Heating Plant, increasing the contract by $3,754 for installation of one complete set of primary and control switchgear equipment (to complete unit No. 13) to provide for interchange of power service with the Illinois Iowa Power Company. T h e Board of Trustees, on October 21, 1040 (Minutes, page 105), authorized an agreement for the interchange of electric service. T h e additional equipment to be purchased duplicates that which has already been furnished under an existing contract with the Allis-Chalmers Manufacturing Company.

On motion of Mr. Davis, this change was authorized.

CONTRACT CHANGE ORDERS ON P.W.A. PROJECTS (16) A recommendation from the Director of the Physical Plant Department that the following contract change orders be authorized: Illini Union Building Contract Change Order No. 11 with the Wadeford Electric Company for electrical work. (1) Incidental changes in electrical connections to motors throughout the building in accordance with quotation dated November 4, 1940 $307 75 (2) E x t r a work in Room No. 121 as covered by full size detail drawing 152-C 14 38 Total Additional Cost $322 13 Contract Change Order No. 12 with the W a d e f o r d Electric Company for electrical work. (1) Provide electrical connections to food service equipment, in accordance with quotation dated November 26, 1940 $769 65 (2) Provide four Belson No. 1580-A lights for main stairs to basement (Space No. 44) in accordance with quotation dated November 18, 1940 135 00 Total Additional Cost $904 65 Contract Change Order No. 13 with the W a d e f o r d Electric Company for electrical work. (1) Do wiring necessary to complete west wing in fourth story for future completion as hotel rooms, as indicated on sheets No. 48 and 48-A of the drawings—Add $258 00 (2) Incidental electrical changes in Rooms Nos. 112, 115, 138, and 141—Add 33 80 Total Additional Cost ~ $291 80 Contract Change Order No. 14 with the W a d e f o r d Electric Company for electrical work. F o r changes in concealed lighting fixtures in Cafeteria Room No. 31 as covered by quotation dated November 29, 1940—Add 308 64 Contract Change Order No. 4 with the G. H . Schanbacher & Son Company for interior painting and decorating. Omit finishing of temporary doors and partitions at fourth story openings to two main stairs included in Change O r d e r No. 2— Deduct 49 00