658

BOABD OF TRUSTEES

[August 10

Replacement of ceiling and other repairs in cafeteria of Chicago Ulini Union Building lg Q™ Remodeling building at 512 East Chalmers Street, Champaign, for offices of College of Commerce and Business Administration 47^ 7. School of Music, for pianos g 100 Totd .|59"7» I concur.

On motion of Mr. Swain, these appropriations were made by the following vote: Aye, Mr, Clement, Mr. Dilliard, Mr. Harewood, Mr, Hughes, Mr. Johnston, Mr. Pogue, Mr, Swain, Mrs, Watldns, Mr! Wilkins, Mr, Williamson; no, none; absent, Mr, Kerner.

CONTRACT FOR REMODELING IN FIRST UNIT O F DENTISTRY-MEDICINE-PHARMACY BUILDING

(23) The Director of t h e Physical Plant and the Vice-President and Comptroller recommend award of a contract for $3,975 to the Simpson Construction Company, Chicago, the lowest bidder, for remodeling in the Dentistry-Medicine-Pliarniacy Building (first unit), to provide a research laboratory for the Department of Anatomy in a room formerly occupied by the Animal Hospital which is now housed in the Medical Research Laboratory. Funds are available in a United States Public Health Service grant {USPHS 2G-604). I concur.

On motion of Mr. Harewood, this contract was awarded by the following vote: Aye, Mr, Clement, Mr. Dilliard, Mr. Harewood, Mr, Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr, Wilkins, Mr. Williamson; no, none; absent, Mr. Kemer.

CONTRACTS FOR CONSTRUCTION OF GASEOUS ELECTRONICS LABORATORY

(24) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of contracts, as listed below, to the lowest bidders for the construction of a Gaseous Electronics Laboratory building at 607-609 East Haley Street, Champaign. General Work — Casserly Construction Company, Champaign J 79 370 Base Bid ... $80 145 ; Deductive Alternate; Omission of asphalt tile flooring for the mezzanine 775 Electrical— Square Deal Electrical Contracting, Inc., Urbana 26 500 Plumbing — David W. Reichard Plumbing and Heating, Urbana 13 700 Heating, Pipings Refrigeration, and Automatic Temperature Control Systems — F . R. Inskip and Company, Champaign IS MVentilating and Distribution System for Conditioned Air — Reliable Plumbing and Heating Company, Champaign 16 &jj Total Contracts $1551* Funds for financing this project will come from: Electrical Engineering, Indirect Costs ^^2K Research Board, Indirect Costs 30^0 General Indirect Costs..._ 4Jj W U National Science Foundation Grant - iSX Electrical Engineering, Indirect Costs, Jordan -jjUS #87 000 Confirmation of the grant from the National Science Foundation is penflW Should this grant not be available, an additional $60,000 will be provided from tl* Department of Electrical Engineering's share of indirect costs. , _. . Submitted herewith is a_ supporting memorandum from the Physical t»" Department on this project, including a schedule of the bids received, a copy a which is being filed with the Secretary of the Board for record. I concur.