UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1389]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1389 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1386

With Whom United States Air Force AF 33 (658) 47 United States Air Force AF 41 (609) 1481 United States Army DA 49-193-MD-2222 United States Army DA SIG 36-039-62-G 19 United States Atomic Energy Commission AT (11-1) 1142 United States Department of Agriculture 12-14-100-5318 (45) United States Department of Agriculture 12-14-100-5770 (74) United States Department of Health, Education, and Welfare OE 2-10-087 Total

BOARD OF TRUSTEES Amount to be Paid to the Purpose University Multiple panel reinforced concrete 3 2 500 00 floor slabs Determinants of monitoring behav19 642 00 ior in complex tasks Experimental ketosis in man 27 806 00 Investigation of water droplet coalescence Field of radio chemistry Simple and reliable diagnostic test for hog cholera Development of methodology and physiological studies relating to characteristics of dry bean products Comparison between two kinds of secondary mathematics courses with respect to intellectual changes 35 000 00 36 720 00 6 000 00 45 530 00

[March 17

Effective Date December 30, 1961 February 1, 1962 February 1, 1962 January 31, 1962 February 1, 1962 January 26, 1962 January 23, 1962

47 393 00

February 1, 1962

S396 757 00 Effective Date January 26, 1962

Amount to be Paid by the With Whom Purpose University Chicago Title & Trust Co. Title policy, site of Medical Sciences $ 2 700 00 (emergency—approved Building Addition by the President) Amount to be Paid by the Purpose University Farm machinery lease, two manure $ 150 29 spreaders, one platform carrier

Leases

With Whom International Harvester Co.

Effective Date August 10, 1961

Contract Changes

Amount to be Paid to the University With Whom Purpose Causes of failures in railroad rails in $ 19 500 00 Association of American service Railroads Heating, ventilating, and air con29 175 00 National Warm Air ditioning as related to warm-air Heating and Air furnace heating Conditioning Association Strength and deformation charac35 000 00 teristics of reinforced concrete Portland Cement beam-column connections subAssociation jected to axial and transverse loads 25 000 00 United States Air Force Energy absorbing characteristics of soil and rock AF 29 (601) 4302 Testing of concrete strips and slabs United States Air Force 1 249 93 reinforced with continuous steel A F 3 3 (600) 31319 plate United States Army Interaction of interstitial impurities 936 94 with defect in B.C.C metals DA 11-022-ORD-2705 Influence of tomato constituents on 15 630 00 United States Army flavor of irradiated milk DA 19-129-QM-1709 Properties of the inert gas solids 28 056 00 United States Atomic Energy Commission AT (11-1) 971 Low-cycle, high-stress fatigue be30 000 00 havior United States Navy 600 00 Properties and kinetics of heat reNObs-77008 sistant enzymes found in bacterial United States Navy spores Nonr 1834 (09) J185 147 87 Total Effective Date December 11, 1961 January 26, 1962 January 22, 1962

January 1, 1962 January 3. 1962 February 19, 1962 December 7, 1961 February 1, 1962 December 15, 1961 December 20, 1961