1962]

UNIVERSITY OF I L L I N O I S

1381

were accepted for electrical and mechanical work. The original amount of Alternate 1A ($15,000) plus the increase ($1,160) will cover the general contractor's supervisory charge for assignment of the contracts for all divisions of the work. Submitted herewith are schedules of all bids received, a copy of which has been filed with the Secretary of the Board for Record. Funds are available in the state capital appropriations for 1961-63 from the Universities Building Fund. I concur in these recommendations. O n m o t i o n of M r . J o h n s t o n , t h e s e c o n t r a c t s w e r e a u t h o r i z e d b y t h e following v o t e : A y e , M r . C l e m e n t , M r . D i l l i a r d , M r . H a r e w o o d , M r . Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, M r s . Watkins, Mr. Wilkins, M r . W i l l i a m s o n ; no, none; absent, M r . K e r n e r . CONTRACT FOR INSTALLATION OF ELEVATORS IN BURNSIDES RESEARCH LABORATORY (11) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of a contract for $21,400 to the Fairhall Elevator and Machine Company, Danville, the lowest bidder, for the installation of elevators in the Burnsides Research Laboratory. At the time other contracts for the construction of the Burnsides Research Laboratory were awarded, only one bid on the elevator installation had been received and it was rejected and new bids have been taken. Funds are available in the construction budget for the project. 1 concur. O n m o t i o n of M r . H u g h e s , t h i s c o n t r a c t w a s a u t h o r i z e d b y t h e following v o t e : A y e , M r . C l e m e n t , M r . D i l l i a r d , M r . H a r e w o o d , M r . Hughes, M r . Johnston, M r . Pogue, M r . Swain, M r s . W a t k i n s , M r . Wilkins, M r . W i l l i a m s o n ; no, n o n e ; absent, M r . K e r n e r . CONTRACTS FOR ADDITIONS TO THE ABBOTT POWER PLANT (12) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of the following contracts for work related to the construction of the addition to the Abbott Power Plant: Relocation of existing 250 K W Diesel generator (Division "9-E") — Superior Construction Company, Inc., Gary, Indiana $26 398 Electrical work for relocation of 250 K W Diesel generator (Division "9-F") — Square Deal Electrical Contracting, Inc., Urbana 4 155 Funds are available in the state capital appropriations for 1961-63 from the Universities Building Fund. I concur. O n m o t i o n of M r . S w a i n , t h e s e c o n t r a c t s w e r e a u t h o r i z e d b y t h e following v o t e : A y e , M r . C l e m e n t , M r . D i l l i a r d , M r . H a r e w o o d , M r . Hughes, M r . J o h n s t o n , M r . Pogue, M r . Swain, M r s . W a t k i n s , M r . Wilkins, M r . W i l l i a m s o n ; no, n o n e ; absent, M r . K e r n e r . CONTRACTS FOR REMODELING AND IMPROVEMENTS AT MEDICAL CENTER CAMPUS (13) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of the following contracts, the award in each case being to the lowest bidder: Dentistry-Medicine-Pharmacy Building, First Unit, Remodeling Room 521 — Simpson Construction Company, Chicago $3 713 This space, vacated by the Animal Hospital when it was moved into the Medical Research Laboratory, is being remodeled to provide laboratory facilities for the Department of Anatomy. The work will consist of installation of laboratory furniture and utilities. Funds are available in United States Public Health Service Grant RG 4728 C5.