UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1266]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1266 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1962]

UNIVERSITY OF ILLINOIS

1263 3 3

Animal Science 102 or Dairy Science 102— Feeds and Feeding Dairy Science 100 — Introduction to Dairy Production Six hours from the following: Entomology 101— Agricultural Entomology Forestry 100 — F a r m Forestry (or Forestry 101 —General Forestry) Horticulture 100 — Introductory Horticulture Horticulture elective Plant Pathology 204 — Introductory Plant Pathology Total

"22"

These revisions are made to meet a change in the Illinois State Board of Vocational Education requirements. The Senate Coordinating Council indicates that no other Senate jurisdiction is involved. I recommend approval. O n m o t i o n of M r . C l e m e n t , t h e s e r e v i s i o n s w e r e a p p r o v e d . REQUIREMENTS FOR DEGREE OF BACHELOR OF SCIENCE IN PHYSICS (3) The Urbana-Champaign Senate recommends that the requirements for graduation in the curriculum in physics be increased from 124 to 126 hours, plus required military science and physical education. The Senate Coordinating Council indicates that no other Senate jurisdiction is involved. I recommend approval. O n m o t i o n of M r . J o h n s t o n , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d . REVISION IN REQUIREMENTS FOR DEGREE OF BACHELOR OF SCIENCE IN DENTISTRY (4) The Senate of the University of Illinois at the Medical Center recommends that Russian be added to the languages acceptable toward the degree of Bachelor of Science in Dentistry. The Senate Coordinating Council indicates that no other Senate jurisdiction is involved. I recommend approval. O n m o t i o n of M r . S w a i n , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d . CONTRACTS FOR CONSTRUCTION OF ADDITION TO ELECTRICAL ENGINEERING BUILDING (5) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of the following contracts for construction of an addition to the Electrical Engineering Building and incidental work in connection therewith, the award in each case being to the lowest bidder: General — Pathman Construction Company, Chicago $485 160 Base Bid $488 660 Additive Alternate Substitution of vinyl asbestos tile throughout the building for asphalt tile 3 200 Deductive Alternates Leaving all penthouse walls intact —5 700 Substitution of all-weather concrete insulation in lieu of foam glass roof insulation —1 000 Electrical — Downtown Electric, Urbana 73 825 Plumbing— Nu-Way Plumbing Service, Inc., Chicago 24 130 Heating, Refrigeration, and Temperature Control — Ideal Heating Company, Chicago 182 888 Base Bid $144 444 Additive Alternate For equipment only, for air conditioning of present building 38 444 Ventilating— Petry Roofing and Sheet Metal Company, Champaign 113 322 Elevator — Otis Elevator Company, Chicago 8 403 Total $887 728