UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 829]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 829 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1967]

U N I V E R S I T Y OF I L L I N O I S

777

lowing vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Swain; no, none; absent, Governor Kerner, Mr. Page, Mr. Pogue, Dr. Weatherly.

CONTRACT FOR CONSTRUCTION OF NEW STEAM SERVICE TO PSYCHOLOGY LABORATORY, URBANA (17) The President of the University recommends award of a contract for $84,656 to The N u - W a y Contracting Corp., Chicago, the lowest bidder, for the provision of steam service to the Psychology Laboratory, Urbana. Funds are available in state capital appropriations to the University and have been released. O n m o t i o n of M r . C l e m e n t , t h i s c o n t r a c t w a s a w a r d e d b y t h e following vote: Aye, M r . Clement, Mr. Grimes, M r . H a h n , M r . Hughes, M r . J o h n s t o n , M r . Jones, M r . S w a i n ; no, n o n e ; absent, G o v e r n o r K e r ner, M r . Page, M r . Pogue, Dr. Weatherly. CONTRACTS FOR AIR CONDITIONING AND REMODELING OF MATHEMATICS LIBRARY IN ALTGELD HALL, URBANA (18) The President of the University recommends the assignment of $40,249 from the Urbana-Champaign General Reserve and award of the following contracts, based on the percentages bid for contractors' fees, for air conditioning and remodeling the Mathematics Library in Altgeld Hall, Urbana, the award in each case to the lowest bidder. (All appropriate administrative officers have been consulted.) Per Cent Per Cent Per Cent Estimated Total for for for SubFee Estimated Material Labor contracts Payments Payments General — Barber & DeAtley, Inc., Urbana S 28 10 $ 748 40 $ 5 182 00 Electrical — G. L. Wilsky, an individual doing business as Downtown Electric, Urbana 27 18 0 232 38 1 291 00 Heating, Piping, Refrigeration and Automatic Temperature Control Systems — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 25 38 10 3 044 85 13 138 00 Ventilation and Distribution Systems for Conditioned Air — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 25 35 0 2 878 15 13 285 00 Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Mr. Swain, these recommendations were approved by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Swain; no, none; absent, Governor Kerner, Mr. Page, Mr. Pogue, Dr. Weatherly.

CONTRACTS FOR REMODELING IN NATURAL HISTORY BUILDING FOR THE DEPARTMENT OF ZOOLOGY. URBANA (19) The President of the University recommends assignment of $169,310 from the Urbana-Champaign General Reserve and award of the following contracts, based on the percentages bid for contractors' fees, for remodeling eleven rooms in the Natural History Building for the Department of Zoology of the College of Liberal Arts and