UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 830]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 830 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



778

BOARD OF TRUSTEES

[October 16

Sciences, Urbana, the award in each case to the lowest bidder. (All appropriate administrative officers have been consulted.) Per Cent Per Cent Per Cent Estimated Total for for SubFee for Estimated Material Payments contracts Labor Payments General — Dean Evans Co., $9 260 00 ?75 260 00 26 Champaign 4 Electrical — Wm. H. Brunkow, an individual doing business as Brunkow Electric Co., 24 2 100 00 13 100 00 Champaign 10 Plumbing — Wren C. Thomas and Willis H. Thomas, a partnership doing business as Thomas Plumbing and 5 445 00 21 945 00 Heating Company, U r b a n a . . 20 47 Heating, Piping, Refrigeration and Automatic Temperature Control Systems — W. L. Rogers, an individual doing business as Cool-Rite 38 10 2 611 00 11 811 00 Refrigeration, Urbana 25 Ventilation and Distribution Systems for Conditioned Air — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, 10 1 825 00 8 325 00 Urbana 25 35 Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Mr. Jones, these recommendations were approved by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Swain; no, none; absent, Governor Kerner, Mr. Page, Mr. Pogue, Dr. Weatherly.

EMPLOYMENT OF ENGINEERS. URBANA

(20) The President of the University recommends employment of the following firms for complete engineering services, including design and bid documents, for the projects and on the terms indicated: A. Warren & Van Praag, Inc., Decatur Extensions and improvements to the Schedule B of minimum fees of Illinois Water Distribution System Society of Professional Engineers, 1965 Edition B. Associated Engineers, Inc., Peoria Seven per cent of actual construction Air conditioning Smith Music Hall costs C. Sargent & Lundy, Engineers, Chicago Study and report on boiler and Direct costs plus 100 per cent of salary smokestack efficiency at Abbott and wages of technical personnel, not to Power Plant exceed $8,000 Funds are available for the above projects in state capital appropriations to the University, subject to release by the Governor, and in the Physical Plant Department budget. The Advisory Committee on Architectural and Engineering Services and all appropriate administrative officers have been consulted.

On motion of Mr. Hahn, this recommendation was approved by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr.