1967]

UNIVERSITY OF ILLINOIS

561

Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. I concur. O n motion of M r . Hughes, this contract was awarded by the following vote: Aye, M r . Clement, M r . Grimes, M r . H a h n , Mr. Hughes, M r . Johnston, Mr. Jones, M r . Pogue, Mr. S w a i n ; no, none; absent, Governor Kerner, M r . Page, Dr. Weatherly.

CONTRACTS FOR REMODELING SPACE VACATED BY MICROBIOLOGY AND PATHOLOGY FOR T H E DEPARTMENT OF HISTOLOGY, MEDICAL CENTER CAMPUS

(25) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of contracts for remodeling space vacated by the Departments of Microbiology and Pathology in the College of Medicine for the Department of Histology in the College of Dentistry at the Medical Center campus, the award is each case to the lowest bidder. General — Heller Construction Company, Inc., Chicago $44 998 00 Electrical — Schaeffer Electric Co., Division of Sam Schaeffer Co., Chicago 16 134 00 Heating, Refrigeration, and Temperature Control — Midstates Heating Co., Chicago 11 600 00 Pipe Covering and Insulation — Chicago Asbestos Manufacturing Company, Chicago 1 695 00 Plumbing — Peter H. Smith Company, Chicago 3 589 00 Ventilation — Crone Associates, Inc., Chicago 6 100 00 Total $84 116 00 The work provides for the installation of new partitions, new lighting and power distribution, suspended acoustical ceiling, new laboratory furniture, reworking old laboratory furniture, and air conditioning. Funds for this work are available from state capital appropriations for 1965-67 and federal research grants. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. I concur.

On motion of Mr. Swain, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Pogue, Mr. Swain; no, none; absent, Governor Kerner, Mr. Page, Dr. Weatherly.

CONTRACTS FOR ANATOMY REMODELING, FIRST UNIT OF DENTISTRY-MEDICINE-PHARMACY BUILDING, MEDICAL CENTER CAMPUS

(26) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of contracts for remodeling in the Department of Anatomy, College of Medicine, at the Medical Center campus, the award in each case to the lowest bidder. General — Heller Construction Company, Inc., Chicago $15 816 00 Plumbing — The Nu-Way Contracting Corp., Chicago 3 113 00 Process Piping — Peter H. Smith Company, Chicago 2 847 00 Ventilation — Narowetz Heating and Ventilating Company, Chicago 2 973 00 Electrical — Fries Walters Co., Chicago 4 775 00 Wood Laboratory Equipment — J. J. Lane Equipment Co., Chicago... 9 305 00 Metal Laboratory Equipment — Laboratory Furniture Co., Inc., Chicago 8 385 00 Total $47 214 00 The work provides for the rearrangement of partitions, new lighting, floor