UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 1033]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1033 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1968]

UNIVERSITY OF ILLINOIS

981

On motion of Mr. Williamson, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Mr. Williamson; no, none; absent, Governor Kerner, Mr. Pogue, Dr. Weatherly.

CONTRACTS FOR REMODELING OF EAST CHEMISTRY BUILDING. URBANA (25) The President of the University, with the concurrence of appropriate administrative orficers, recommends award of the following cost-plus contracts, based on percentages bid for contractors' fees, for remodeling of a portion of the East Chemistry Building for the Chemical Engineering Division of the Department of Chemistry and Chemical Engineering, Urbana, the award in each case to the lowest acceptable bidder: Per Cent Per Cent Per Cent Estimated Total for for for SubFee Estimated Material Labor contracts Payments Payments General — Dean Evans Company, Champaign 5 28 20 $2 000 00 $14 100 00 Electrical — William H. Brunkow, an individual doing business as Brunkow Electric Company, Champaign 10 24 0 555 00 3 405 00 Plumbing — Jack W. Perrone and Harold L. Fox, a partnership doing business as Champaign Plumbing & Heating Company, C h a m p a i g n . . . . 25 40 5 855 00 3 455 00 Funds are available in state capital appropriations to the University for 1967-69 and have been released by the Governor. Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Mr. Hahn, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Hahn, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Mr. Williamson; no, none; absent, Governor Kerner, Mr. Page, Dr. Weatherly.

CONTRACTS FOR REMODELING OF NATURAL HISTORY BUILDING. URBANA (26) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts, based on percentages bid for contractors' fees, for remodeling of a portion of the Natural History Building on the Urbana campus for the Division of General Studies, the award in each case to the lowest acceptable bidder : Per Cent Per Cent Per Cent Estimated for for for SubFee Material Labor contracts Payments Total Estimated Payments

General — Dean Evans Co., Champaign 5 27 10 $ 1 1 9 0 00 $7 290 00 Electrical — Remco Electrical Corporation, Champaign 6 25 4.9 1 1 5 4 90 7 754 90 Plumbing — Jack W. Perrone and Harold L. Fox, a partnership doing business as Champaign Plumbing & Heating Company, C h a m p a i g n . . . . 25 40 5 1 3 0 5 00 5 405 00 Funds are available in state capital appropriations to the University for 1967-69 and have been released by the Governor. Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.