UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 1032]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1032 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



980

BOARD OF TRUSTEES

[March 20

Mr. Jones, Mr. Pogue, Mr. Swain, Mr. Williamson; no, none; absent, Governor Kerner, Mr. Pogue, Dr. Weatherly.

CONTRACTS FOR REMODELING ENGINEERING HALL, URBAN A (23) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts based on percentages bid for contractors' fees, for remodeling a portion of Engineering Hall for the Engineering Library, a branch of the Main Library, Urbana, the award in each case to the lowest bidder: Per Cent Per Cent Per Cent Estimated Total for for for SubFee Estimated Material Labor contracts Payments Payments General — Skoog Construction Company, Champaign 5 22 5 $3 235 00 $23 735 00 Electrical — Remco Electrical Corporation, Champaign 5 24 5 1 2 8 3 00 7 183 00 Heating, Piping, Refrigeration and Automatic Temperature Control Systems — Cool-Rite Mechanical Contractors, Inc., Urbana 14 31 5 2 342 00 10 942 00 Funds are available in state capital appropriations to the University for 1967-69 and have been released by the Governor. Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. O n m o t i o n of M r . H a h n , t h e s e c o n t r a c t s w e r e a w a r d e d b y t h e following vote: Aye, Mr. Clement, Mr. Grimes, M r . H a h n , Mr. Hughes, M r . J o n e s , M r . P o g u e , M r . S w a i n , M r . W i l l i a m s o n ; n o , n o n e ; absent, Governor Kerner, Mr. Page, Dr. Weatherly. CONTRACTS FOR REMODELING OF NUCLEAR ENGINEERING LABORATORY.URBANA (24) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts, based on percentages bid for contractors' fees, for remodeling a portion of the Nuclear Engineering Laboratory for the Nuclear Engineering Program of the College of Engineering, Urbana, the award in each case to the lowest bidder: Per Cent Per Cent Per Cent Estimated Total for for for SubFee Estimated Material Labor contracts Payments Payments General — Skoog Construction Company, Champaign 5 26 5 $ 1 7 8 0 00 $12 180 00 Electrical — Remco Electrical Corporation, Champaign 5 24 5 540 00 3 740 00 Heating, Piping, Refrigeration and Automatic Temperature Control Systems — Cool-Rite Mechanical Contractors, Inc., 20 35 5 Urbana •.••:•••. 102500 502500 Ventilation and Distribution Systems for Conditioned Air — Reliable Plumbing & Heating Company, Champaign 25 42 5 1 3 1 8 00 5 118 00 Funds are available in state capital appropriations to the University for 1967-69 and have been released by the Governor. Submitted herewith is a report from the Physical Plant Department, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.