UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1940 [PAGE 677]

Caption: Board of Trustees Minutes - 1940
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 677 of 1164] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



674

BOARD OF TRUSTEES

[December 18

connection therewith, such line to be constructed in such manner as shall not interfere with the reasonable and necessary use of any of the property of licensor for educational purposes. Such license shall not be revoked on less than six months notice in writing to the licensee, and then only when the educational interests of the University seem, in the judgment of the Board of Trustees, to require a revocation. Be it further resolved, that the foregoing and within license is granted to licensee on the express condition and understanding that said gas transmission and distribution line will be constructed, maintained, and operated solely at the expense of licensee; that said line shall be so constructed, operated, and maintained as to not interfere with the free use of the streets, avenues, or thoroughfares upon which the same is to be located. C O N T R A C T C H A N G E O R D E R S ON P . W . A . P R O J E C T S (6) In accordance with the authorization of the Board of Trustees, I have approved the following contract change orders and request confirmation of such approval: Illini Union Building Change O r d e r No. 3, contract with the Phillips, Getschow Company for Heating, Ventilating, and Air Conditioning W o r k . (1) Change vacuum and condensate pump discharge pressure from 50 ft. head to 40 lbs $187 00 (2) Furnish and install gate valves on blast heater connections to float traps 44 00 (3) Change return lines and radiation in bowling alley in accordance with quotation of November 7, 1939 119 40 Total Additional Cost $35o 40 Fifth Addition to the Library Change Order No. 10, contract with English Brothers for General Work. (1) Furnish and install two fixed doors at third and fourth stack levels of first stack addition in accordance with quotation of November 20, 1 9 3 9 . . . . $ 75 00 (2) Apply gold bronze figures approximately 1" high to all new doors installed in the above addition at $.75 per door 88 50 Total Additional Cost $163 50 First Addition to McKinley Hospital Change Order No. 1, contract with Garland B. Fletcher for Equipment, Group V. Provide the following additional light bulbs for attic and night lights as per bid unit prices: Six 60-watt @ .111 $ o 67 Forty-six 25-watt @ . I I I 511 T w o double filament @ .45 90 Total Additional Cost 7777777 $ Change O r d e r No. 3, contract with Hatfield Electric Company for Electrical W o r k . (1) Ninety-six socket extensions $ 5 76 (2) T w o special plastic fixtures with tri-lite s o c k e t s . . . 17 40 (3) Replacement of ceiling "band and ball" fixture in first floor corridor with typical plastic fixture 3 30 (4) Provision of nurse call station in Room # 1 2 5 . . . . 14 97 (5) Additional labor and materials required to properly install nurse call system in Rooms 317-321, i n c l . . . . 14 33

6 68