656

BOARD OF TRUSTEES

[November 24

Fifth Addition to the Library Change O r d e r No. 8, contract with English Brothers for General Work. F u r r out piping south of book conveyor in all stories, extending same to next opening to present stack units—Add $496 80 Change Order No. 9, contract with English Brothers for General Work. (1) Replace with new, present lintels in second story at openings to present stacks to increase head room, quotation of September 19, 1939—Add $133 50 (2) Omit cutting lintels for two fourth story openings shown on drawings, quotation of September 19, 1939—Deduct 53 40 Net Addition $ 80 10 Change Order No. 1, contract with W . B. Read and Company for Equipment, Group I I . Increase length of 98 cubicle table tops to 48" but holding maximum over-all dimension for legs to 37" @ 750—Add $ 73 50 Change O r d e r No. 3, contract with the Anderson Electric Company for Electrical W o r k . Rearrange lighting now under pneumatic tubing in fourth story —Add. $ 41 75 First Addition to McKinley Hospital Change O r d e r No. 8, contract with W m . C. F. Kuhne for General Work. (1) F o r additional expense for construction of and insulation of breeching connection to incinerator to meet new requirements of manufacturer in accordance with proposal dated October 10, 1939.. $310 19 (2) F o r incidental plaster changes through building, principally to cover plumbing lines, quotation of October 7, 1939—Add 159 05 (3) F o r provision of terrazzo seal and finish in ground story only, quotation of October 4, 1939—Add.... 25 71 Total Additional Cost $494 95 Change O r d e r No. 9, contract with W m . C. F . Kuhne for General Work. Provide offset type white bronze sash lifts in accordance with quotation dated 10/24/39—Add $121 00 Gregory Hall Change Order No. 11, contract with W. E. O'Neil Construction Company for General W o r k . This is to approve use of unselected red and white birch for interior trim where only red birch is specified—Deduct $200 00 Change Order No. 12, contract with W . E. O'Neil Construction Company for General W o r k . F o r changes in h a r d w a r e in accordance with letter dated June 7, 1939—Add $101 87 O n m o t i o n o f M r . P o g u e , t h e a c t i o n o f t h e P r e s i d e n t of t h e U n i v e r s i t y in a u t h o r i z i n g these c h a n g e s w a s a p p r o v e d a n d confirmed.

GREGORY HALL CONTRACT CHANGE ORDER

(11) A recommendation from the Physical Plant Department for the approval of a change in the general contract for Gregory Hall ( P W A Project, 111. 1062-F) to provide for the installation of one counter in Room 14 and two in