I939]

UNIVERSITY OF ILLINOIS

655

Add primary disconnecting devices and isolators for Generator # 4 on Item 3 of Specifications Net Deduction

$ 1 007 00 $10 360 00

On motion of Mr. Pogue, these changes were approved. CONTRACT CHANGE ORDERS ON PWA PROJECTS

(10) In accordance with the authorization of the Board of Trustees, I have approved the following contract change orders and request confirmation of such approval. Illini Union Building Change Order No. 2, contract with the Phillips, Getschow Company for Heating, Ventilating, and Air Conditioning Work. (1) Provide openings in present concrete walls necessary to receive piping in accordance with quotation of 9/5/39—Add $319 70 (2) In order to permit elevating piping across Fountain Room feed north unit heater on east wall of bowling alley from the south as directed by Mr, Brunkow—Add 91 00 Total Additions $410 70 (3) F o r omission of tests on steel pipe in accordance with estimate of October 2, 1939—Deduct 9 01 Net Additional Cost $401 69 Change Order No. 3, contract with the Wadeford Electric Company for Electrical Work. F o r furnishing and installing 99 extra circuits in lighting cabinets—Add $435 60 Change O r d e r No. 2, contract with English Brothers for Work. (1) Omit fireplace in east wall of main dining room in accordance with quotation (Credit) (2) Omit hood supports in kitchen in accordance with quotation of August 2, 1939 (Credit) (3) Change Fondulac flagstone in ground story from a honed to a natural cleft surface, in accordance with quotation of August 24, 1939 (Credit) (4) Furnish terrace Blue Stone border with hand dressed instead of sawed edges, according to quotation of August 24, 1939 (Credit) Total Credits (5) Provide terrace panels of Crab Orchard Stone with snapped , edges, according to quotation of August 24, 1939—Add $614 45 (6) Provide area drain for pavement in delivery area according to quotations of 7-20-39 and 8-26-39—Add 67 21 (7) Repaint two P W A signs in accordance with quotation of 8-10-39—Add 15 00 Net Credits General $137 91 180 00 344 52 179 76 $842 19

696 66 $145 53

Change O r d e r No. 2, contract with the A r t h u r W . Murray Company for Plumbing. Provide 4 additional hose cabinets and other incidental changes to fire protection system as outlined in letter of September 21, 1939—Add $319 14