EXTRACTED TEXT FROM PAGE:



1984]

UNIVERSITY OF ILLINOIS

519

Funds are available in the FY 1984 institutional funds budget of the College of Pharmacy. This project is to renovate a 30-year-old student laboratory (2,200 square feet) into a modern laboratory for endorphine research. T h e work will include demolition and new construction to provide the new laboratory, offices, storage areas, air conditioning and ventilating, and new laboratory services and benches. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bolen, Mr. Milkint; no, none.)

Contract for Chilled-Water System Connection, Chicago

(18) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract to Bellis-Hanley, Inc., Chicago, for $41,000. T h e project is to connect the existing chilled-water piping system in the Student Residence Hall to the central facility which serves the "campus services complex." (The latter is the group of buildings in the block bounded by Polk and Taylor Streets and Wolcott and Damen Avenues.) Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve Account. An existing system in the Student Residence Hall provides cooling to the building's first floor and a portion of the second floor. By connecting the system to the central chilled-water facility, the efficiency of the cooling system will be improved. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Howard, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Bolen, Mr. Milkint; no, none.)

Contracts for Carpeting, Furniture, and Partitions, Stevenson Hall, Chicago

(19) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts to provide carpeting, furniture, and movable partitions in Stevenson Hall at the Chicago campus. T h e award in each case is to the low bidder on its base bid. Carpeting Business Interiors, Inc., Des Plaines Furniture and Partitions Business Interiors, Inc., Des Plaines Total Base Bid $ 9 347 74 338 $83 685

Funds are available in the FY 1984 appropriated funds budget of the College of Liberal Arts and Sciences.