494

BOARD OF TRUSTEES

[February 16

Funds for this project are available in the Fiscal Year 1984 State appropriated funds budget of the College of Engineering. Although frequent technological advances and shifts in program emphasis have occurred in the field of civil engineering, no major remodeling has occurred since these buildings were constructed between 1966 and 1970. Consequently, the Department of Civil Engineering needs to rehabilitate some of its facilities, consolidate staff and activities, and replace equipment. This will result in the release of space needed for the Departments of Computer Science and Electrical Engineering. T h e project entails general and mechanical/electrical work which will result in 5,022 square feet of office and storage space and 9,746 square feet of laboratory space within these buildings. A schedule of the bids received has been filed with the secretary of the board for record.

O n motion of Mr. Logan, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, M r . Forsyth, Mr. H a h n , Mr. Howard, M r . Logan, Mr. Madden, Mr. Stone; no, none; absent, Mrs. Shepherd, Governor Thompson. ( T h e student advisory vote was: Aye, Mr. Milkint; no, none; absent, Mr. Bolen.) Contracts, Remodeling, Roger Adams Laboratory, Urbana

(17) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for remodeling in Roger Adams Laboratory, Department of Chemical Engineering, to the low base bidders on their base bids, plus acceptance of the indicated alternate bids. 1 General McDowell Construction Co., Inc., Danville $14 933 Base Bid 2 235 Alternate G-l 4 317 Alternate G-2 $21 485 Total, General W o r k . . Plumbing Paul H. McWilliams & Sons, Inc., Champaign 25 800 Base Bid 4 180 Alternate G-l 29 980 Total, Plumbing Work Heating, Piping, Refrigeration and Automatic Control System Hart & Schroeder Mechanical Contractors, Inc., Champaign Base Bid 22 612 Ventilation and Distribution Systems for Conditioned Air R. H. Bishop Company, Champaign 14 715 Base Bid Electrical Coad Electric Co., Champaign 7 200 Base Bid $95 992 Grand Total 1 Description of Alternates: Alternate G-l: Assignment oi other contract divisions to the general contractor. Alternate G-2: To furnish and install synthetic stone counter tops and install laboratory cabinets supplied by owner. Alternate P-l: To supply and install all sinks and associated piping, waste, air, gas and

vacuum.