EXTRACTED TEXT FROM PAGE:



1984]

UNIVERSITY OF ILLINOIS

493

Howard, Mr. Logan, Mr. Madden, Mr. Stone; no, none; absent, Mrs. Shepherd, Governor Thompson. (The student advisory vote was: Aye, Mr. Milkint; no, none; absent, Mr. Bolen.)

Contracts, Remodeling, Civil Engineering, Urbana

(16) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts to remodel some 13,000 square feet of the Newmark Civil Engineering Laboratory (NCELB) and 1,400 square feet of the Hydrosystems Laboratory for the Department of Civil Engineering. The award in each case is to the low base bidders on their base bids, plus acceptance of indicated alternate bids.1 General Johnson-Stirewalt Construction Co., Urbana Base Bid $112 496 Alternate G-l 4 625 Alternate G-2 13 830 Alternate G-3 7 362 Alternate G-4 10 544 Total, General Work $148 Plumbing R. H. Bishop Company, Champaign Base Bid 16 Heating, Piping, Refrigeration and Automatic Temperature Control System R. H. Bishop Company, Champaign Base Bid Ventilation Viking Plumbing and Heating, Inc., Danville Base Bid 30 700 Alternate V-3 2 350 Alternate V-4 1 350 Total, Ventilation Work 34 Electrical Modern Electric Company of Illinois, Champaign Base Bid 16 138 Alternate E-2 60 Alternate E-3 2 786 Alternate E-4 610 Total, Electrical Work 19 Grand Total

857

573

600

400

594

$220 024

Acceptance of Alternate G-l provides that all contracts, other than the contract for general work, be assigned to the contractor for general work. It is further recommended that an agreement be entered into with Johnson-Stirewalt Construction Co., for the assignment of the other contracts.

1

Description of Alternates: Alternate 1: Assignment of other contract divisions to the general contractor. AlieinaLe 2: Install a masonry partition, steel mezzanine complete with access stair and new lighting with related wiring and switching below mezzanine in Room B151, NCELB. Alternate 3: Convert existing Fatigue Lab Room 1220K to a classroom in NCELB. Alternate 4: Convert Instructional Labs 1220A and 1215 to lour new offices in NCELB.